Laserfiche WebLink
<br />8.4 Transportation Issues The Developer shall continue to work with the City, <br />Harris County and other public and private sector interests to implement the timely study <br />and/or construction of transportation components. The developer shall provide a <br />proposed schedule of construction for transportation components that impact this project. <br /> <br />ARTICLE IX. SITE RAIL TRAFFIC <br /> <br />9.1 Site Rail Traffic. Proposed development of overpass on Fairmont Parkway will <br />improve rail efficiency in the area and potentially decrease current rail impacts on <br />Fairmont Parkway due to stopped trains, switching etc. However, on-site rail facilities <br />and operations shall be controlled by Owner-Developer. <br /> <br />ARTICLE X. UTILITIES, DRAINAGE <br /> <br />10.1 Utilities, Drainage. The Owner-Developer shall design and construct adequate <br />water, wastewater, and drainage facilities to serve each phase of this project in <br />accordance with the City requirements and as further defined by this Agreement. As to <br />water and sanitary sewer, this would include a water system necessary for both fire <br />suppression and potable water supply with a loop connection to the 16" main on the <br />east side of S.H. 146 and a gravity wastewater disposal system that flows into a 60" <br />trunk line on UK" street south of Fairmont Parkway. <br /> <br />The Developer will provide a drainage study for the subject property, which will include <br />the effect of the development on the surrounding properties as well as other properties <br />in the watershed. The study and design of drainage improvements shall meet the <br />requirements and approval of the City and Harris County Flood Control District. Owner- <br />Developer's representative agrees to meet with City, prior to design of public utilities, to <br />discuss design criteria standards and policies. City shall approve all construction plans <br />and specifications for public improvements. <br /> <br />ARTICLE XI. BUILDING LINES <br /> <br />11.1 Building Lines. The Owner-Developer shall establish building lines appropriate <br />to the use, but not less than those prescribed in the City's Code of Ordinances. Within <br />the industrial area west of Powell Road there will be a landscaped 1 DO-foot buffer and <br />building line along Powell Road. Similarly, along State Highway 146, a 50-foot <br />landscape buffer and building line shall be maintained. These respective 100 and 50 <br />feet landscape buffers shall be kept free from all other uses with the exception of <br />signage, approved drives and entrances. Owner-Developer agrees that other building <br />lines will be either equal to or greater than that required by ordinance for the zoning use <br />shown and shall be based on site use and orientation of the improvements or as shown <br />on the General Plan. <br /> <br />ARTICLE XII. MISCELLANEOUS <br /> <br />Development Agreement(Draft) <br /> <br />Page 6 of 9 <br />