My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
R-1988-13
LaPorte
>
Legislative records
>
Resolutions - GR1000-05 Ordinances & Resolutions
>
1980's
>
1988
>
R-1988-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:48:35 PM
Creation date
7/28/2006 9:14:07 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Resolution
Legislative No.
R-1988-13
Date
9/12/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ei <br /> <br />. <br /> <br />Authority shall sell and deliver (or cause to be delivered) to the City <br />at the points of delivery hereinafter specified, and the City agrees to <br /> <br />purchase from and pay the Authority for the potable Water used by the <br />Ci ty. The Ci ty is required to make payments to the Authori ty even if <br />no Water is delivered to the City by the Authority in accordance with <br />the provisions of Section 6.05. <br /> <br />The unit of measurement for Water delivered hereunder shall be <br /> <br />1,000 gallons of water U. S. Standard Liquid Measure. <br /> <br />Subject to the first paragraph of this section, the Ci ty shall <br />be enti tled to receive the entire amount of the Ci ty' s share of the <br />Demand Allocation Factor and Pumping Allocation Factor. The City may <br />take Water from the Southeast Plant through the Authority Transmission <br /> <br />System, but may not take Water from the Southeast Plant that exceeds <br /> <br />the City's share of production Capacity of the Southeast Plant multi- <br /> <br />plied by City's then current share of the Demand Allocation Factor, <br /> <br />nor may City take Water from the Southeast Plant through the Authority's <br /> <br />Transmission System at a rate which exceeds the City's share of the <br /> <br />Pumping Capacity of the Southeast Plant multiplied by the City's <br />then current share of Pumping Allocation Factor. <br />In the event that the Southeast Plant is not being operated at its <br /> <br />Production Capacity or its Pumping Capacity, the City may, with the <br /> <br />agreement of the Authori ty Director and the Houston Director, use a <br />portion or all the unused Production Capaci ty or Pumping Capaci ty of <br /> <br />the Southeast Plant during a billing period. <br /> <br />When such additional <br /> <br />Production Capacity or Pumping Capacity is used, the City shall pay <br />the Excess production Fee or the Excess Pumpage Fee, or both, as the <br />case may be, as are established in Section 4.05 of the Houston Contract, <br /> <br />-15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.