Laserfiche WebLink
<br />e) <br /> <br />- <br /> <br />ARTICLE I <br />Definition of Terms <br /> <br />Section 1.01 Unless the context requires otherwise, the <br /> <br />following terms and phrases shall have meanings as follows: <br /> <br />(1) Act - Chapter 729, page 2678 et seq., Acts of the 67th <br />legislature of the State of Texas, Regular Session, <br />1981. <br /> <br />(2) Authority - The La Porte Area Water Authority. <br /> <br />(3) Authority Director - the General Manager of the La Porte <br />Area Water Authority, or his designated representative. <br /> <br />(4) Board <br /> <br />The Board of Directors of the Authority. <br /> <br />(5) Bond Resolution - any resolution or order of the Author- <br />. ity, duly approved by the City, which authorizes the <br />issuance of any Bonds. <br /> <br />( 6 ) Bonds - any revenue bonds issued by the Au thor i ty, as <br />authorized by this Contract and any Bond Resolution, <br />whether one or more issues, and the interest appertaining <br />thereto, to finance the Authority's participation in the <br />Southeast Plant, the Transmission System, and the Distri- <br />bution System, including all improvements, enlargements, <br />and expansions thereof, and any Bonds issued to refund <br />such bonds. <br /> <br />(7) City - the City of La Porte, Harris County, Texas. <br /> <br />( 8 ) <br /> <br />City System - the City's <br />sewer system, together <br />extensions, additions, <br />thereto. <br /> <br />existing waterworks and sanitary <br />with all present and future <br />replacements and improvements <br /> <br />(9) Code - the Internal Revenue Code of 1986, as amended. <br /> <br />(10) CWA - the Coastal Water Authority, previously known as <br />the Coastal Industrial Water Authority. <br /> <br />(11) Demand Allocation Factor - the percentage of the prOduc- <br />tion capacity of the Southeast Plant which the Authority <br />is entitled to use at any given time. The initial Demand <br />Allocation Factor for the Authority will be the percentage <br />of the actual production construction cost paid by the <br />Authori ty divided by the total actual production construc- <br />tion cost, as specified in Section 2.01 of the Houston <br />Contract. The initial Demand Allocation Factor is 5.25%. <br /> <br />-4- <br />