Laserfiche WebLink
<br />Damage to the public fences, sound walls and.entry monumentation will be repaired as <br />damage occurs. <br /> <br />5.5 Bi-Lateral Agreement. The Home Owner's Association and the Public <br />Improvement District will enter into a Bi-Lateral Agreement that states that the PID will <br />assess and collect the funds for the maintenance of the items listed above and the HOA <br />will hire the contractors and oversee the actual maintenance activities. <br /> <br />ARTICLE VI. SCHEDULE <br /> <br />6.1 Project sequencing. The Developer shall establish a specific sequence for the <br />development and construction of the project. Engineering, platting and construction of <br />the project are to be by section. The components contained in each section are subject <br />to approval by the City and are delineated in Exhibit C. The project schedule is outlined <br />below. <br /> <br />· Initiation of complete engineering study, including drainage and preliminary <br />infrastructure design. <br />· Detailed engineering design for Phase, including water and sanitary sewer service <br />and initial drainage and detention to accommodate Phase; <br />· Subdivision preliminary platting, site plan, and detailed engineering plans review by <br />the City of La Porte and others; <br />. Submission of Final Plat. <br />· Installation of on-site and off-site improvements in accordance with Plans. <br />· Recordation of Final Plat <br />· Completion of other "Developer Items" such as fences, landscaping, amenities, etc. <br />· Continuation of remainder of development as rapidly as market demands. <br /> <br />6.2 Plat Recordation. The final plat for a section, as approved by City Planning and <br />Zoning, may be recorded once the City has inspected and accepted the Water, Sewer, <br />Drainage and Paving for that section. <br /> <br />It is the intent of the Developer to record the Section 1 plat as soon as the water, sewer, <br />. drainage and paving have been accepted by the City. The following list, plans and <br />specifications subject to City approval, will be considered "Developer Items": 1) sound <br />wall along S.H. 146 2) upgrade wood fence along Wharton Weems Blvd. 3) 4' high <br />ornamental iron style fence along the golf course 4) entry monumentation 5) <br />landscaping and 6) school bus stop 7) Determine and agree to the level of participation <br />and schedule for payment for the signalization of Wharton Weems Blvd. at SH 146. 8) <br />Rear lot line fences adjacent to any pedestrian pathway or similar amenity are to be of <br />like standard with the fence along the golf course and may be passed on to the builder <br />subject to the approval by the City. Completion of "Developer Items" for Section 1 shall <br />continue following recordation of Final Plat, with an anticipated completion date of May, <br />2008. Failure to accomplish the "Developer Items" may give cause for the TIRZ board to <br />withhold further increments. All fence designs, once approved by the City, will be <br />forwarded to the TIRZ Board for further approval. Developer will furnish to the City <br />approved and executed agreements with subsequent builders assigning any <br /> <br />Developer's Agreement (Final) 011708 <br /> <br />Page 5 of 9 <br />