My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2002-2547-A
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2002
>
O-2002-2547-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:08 PM
Creation date
4/18/2008 3:45:23 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
10/14/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SYLVAN BEACH SHORELINE PROTECTION, CEPRA # 1114 <br />PERMITTING, FINAL DESIGN, BID PACKAGE DEVELOPMENT WORK PLAN <br /> <br />1. To address erosion at Sylvan Beach, the GLO shall: <br /> <br />a. Identify, document, and confer with the Qualified Project Partner, the location <br />and extent of the project area. <br />b. Contract with a professional services provider to: <br />document existing conditions/applications and confirm project site <br />location and dimensions; <br />review and summarize historical data and engineering studies; <br />collate data as required to prepare permit application, final design, bid <br />package; <br />conduct site surveying as required; <br />determine all permit requirements and obtain permits; <br />conduct supporting modeling (e.g., SBEACH) for engineering design; <br />develop construction drawings; <br />develop engineering plans and specifications; <br />recommend a post-project monitoring program <br />develop bid package; and <br />estimate construction costs. <br />c. Identify legal requirements for the use of state-owned submerged land. <br />d. Confirm with the Qualified Project Partner, the preferred alternative(s) for <br />erosion response at the project site. <br />e. Estimate total project costs of implementation of preferred alternatives and <br />cost-sharing requirements. <br />f. Provide financial point of contact. <br /> <br />2. To address erosion at Sylvan Beach, the Qualified Project Partner shall: <br /> <br />.....""... <br /> <br />a. Confer and cooperate with the GLO, the location and extent of the area. <br />b. Confer and cooperate with the GLO on the selection of the professional <br />service provider, scopes of work, and preferred alternatives. <br />c. Identify, document, and coordinate with the GLO any in-kind services that <br />will count toward the cost-sharing requirement under this Agreement: <br />labor; <br />contractual; <br />volunteers; <br />equipment; and <br />supplies. <br />d. Document local support (local associations, foundations, and others). <br />e. Provide data from local appraisal districts and taxing entities as needed. <br />f. Confer and cooperate with the GLO to establish a process for obtaining <br />landowner consent, if needed. <br />g. Disclose any other contractual relationship between the Qualified Project <br />Partner and the selected professional service provider (or their subcontractors) <br />during the Agreement term. <br />h. Provide financial point of contact. <br /> <br />&~ <br />.. ..... <br /> <br />. .. <br />... ... <br /> <br />.,..,.... ""... ~': <br /> <br />.....~.; <br />. <br /> <br />........... <br /> <br />_:oh.._: <br />
The URL can be used to link to this page
Your browser does not support the video tag.