Laserfiche WebLink
<br />Mr. Steve Gillette <br />January 27,2006 <br />Page 2 of5 <br /> <br />new gravity sanitary trunk sewer. It also examined the potential elimination of the <br />lift stations at Sens Road and North D Street, and Sens Road and North L Street. <br />Subsequent to the 0301PER, a 42-inch diameter gravity sanitary trunk sewer was <br />constructed along Bay Area Boulevard from Fairmont Parkway to Spencer <br />Highway, and a 36-inch diameter gravity sanitary trunk sewer was constructed <br />along Sens Road from Spencer Highway to North D Street. The lift station at <br />North D Street was eliminated. <br /> <br />The Harris County Public Infrastructure Department's Engineering Division has <br />two engineering design contracts currently underway for the widening of Sens <br />Road. Binkley & Barfield Consulting Engineers, Inc. (BBI) is designing Sens <br />Road from 300-ft. north ofSoencer HiJ!hwav to 300 ft. north of North H Street. and <br />Van De Wiele Engineering, Inc. (VEl) is designing Sens Road from 300 ft. north of <br />North H Street to 300 ft. north of North P Street. The City of La Porte wants to <br />build upon the findings and recommendations of the 0301 PER, and the BBI and <br />VEl designs and investigate both extending the gravity trunk sewer along Sens <br />Road from North D Street to North P Street, and extending gravity sewer mains <br />east and west along the intersecting streets (North D, West Barbour's Cut <br />Boulevard, North H, North L and North P) to the furthest feasible extent. The <br />primary goal of the investigation is to redirect sewage flows which are currently <br />being diverted, and in some cases pumped, through other service areas to other <br />trunk sewers, into the proposed system as was originally intended in the Plan. By <br />so doing, the secondary goal of the investigation will be realized: eliminating a') <br />many of the city's existing wastewater lift stations within these service areas as <br />possible. <br /> <br />The City of La Porte wants to construct the Sens Road portion of the proposed <br />gravity sanitary trunk sewer, as well as a new 12-inch diameter water main (and <br />abandon an existing 6-inch line) prior to the construction of the County's roadway <br />projects. Once constructed, the gravity trunk sewer and water main must coexist <br />with the drainage and roadway improvements such that all can be maintained. <br /> <br />Scope of Services <br /> <br />1) Obtain available Sens Road topographic survey data from the BBI and VEl <br />projects. <br /> <br />2) Supplement the topographic survey data in Item 1 with additional, limited <br />topographic survey data (using GPS methods on the same datum) along the <br />intersecting streets and within the service areas. The data shall include but <br />is not limited to: <br /> <br />~nDe~ele <br />Engineering <br />Incorporated <br />