My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2006-2940
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2006
>
O-2006-2940
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:20 PM
Creation date
5/5/2008 3:43:38 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/11/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Construction Contract City <br /> Dept. M'k <br />1. All blanks must be filled in, except for the signatures // <br /> of the Mayor, City Secretary and City Attorney. <br />2. The numerical figure representing the amount of the // <br /> Contract must agree with the amount that is listed in <br /> words. <br />3. On the signature page: 1/ <br /> (a) Name of corporation must be listed exactly <br /> as it was listed on the first page of the Contract <br /> (b) Have the President or Vice-President of the /; <br /> Corporation sign the Contract. An authorized <br /> person must sign the bond. <br /> (c) Use corporate seal, if any. Otherwise write J/ <br /> "None" underneath the words "Corporate <br /> Seal". <br />Performance and Payment Bond <br />4. The name of the company, the Principal, must be 1/ <br /> listed as it was on the Contract. <br />5. The name of the surety on the bond must appear J/ <br /> the same throughout. <br />6. The amount of the bond must be the same amount /j <br /> listed on the Contract. <br /> <br />CHECKLIST FOR REVIEWING CONTRACT DOCUMENTS <br /> <br />PROJECT DESCRIPTION: Rehabilitation of Sanitary Sewer Manholes by <br />Interior Wall Sealing - CLP Bid no. 06022 <br />APPROVAL DATE: September 11. 2006 <br />APPROVAL ORDINANCE NO.: 2006-2940 <br /> <br />7. <br /> <br />The first date to be filled in on page one on the bond <br />must be the same date as the date of the Contract. <br />The date the bond is signed cannot be prior to the <br />date of the Contract, i.e. the date the bond is signed <br />must be the same or a later date. <br /> <br />J/ <br />JV- <br /> <br />8. <br /> <br />The items listed as work to be done must exactly <br />match the improvements listed on page one of <br />the construction contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.