Laserfiche WebLink
<br />Maintenance of said facilities will rest solely with the Owner-Developer and the property <br />owner's association governing the Tract. <br /> <br />5.2 Buffering and Beautification. The Owner-Developer shall implement a uniform and/or <br />compatible landscape plan for all phases of the entire project that will address landscaping <br />provisions not only adjacent to Wharton Weems Blvd. and Powell Road, but also within the <br />building setbacks and landscape easements or reserves throughout. A Landscape Buffer (a <br />minimum of 50' wide) shall be provided along the west side of Powell Road and shall include <br />extensive screening-type vegetation. A landscape buffer, a minimum of 50' wide, will also be <br />provided along State Highway 146. Landscape reserves shall also be included adjacent to all <br />roadways, including the east side of Powell; but rather than screen, shall be landscaped <br />compatible with the ultimate use of that adjacent property. <br /> <br />5.3 Sign age. The Owner-Developer shall implement a sign standards policy, as part of the <br />Declaration of Restrictive Covenants (Exhibit "D") consistent with the City's Code of <br />Ordinances as guidance to insure effective and uniform signage is employed throughout the <br />project. This policy will include uniform and/or compatible project identification monuments, <br />business signage, street and other traffic directional devices conforming to the Tract's traffic <br />control plan and deed restrictions. <br /> <br />5.4 Ownership and Maintenance. Ownership of the landscape buffers, reserves and <br />easements will be held by fee ownership of adjoining property or by the Property Owners <br />Association (POA), subject to conditions of the deed restrictions and landscape plan. The <br />maintenance of the buffers, reserves and easements will be the responsibility of the contiguous <br />property owners pursuant to provisions of the deed restrictions, enforced by the POA. <br /> <br />The Open Space/Pedestrian Trail System shall be constructed within the drainage easements, the <br />detention pond/drainage system, landscape reserves, or public right-of-ways as dictated by the <br />final detention design. Ownership and maintenance of the Open Space/Pedestrian Trail System <br />and drainage/detention pond system shall be determined according to Article 5.1 of this <br />Agreement. <br /> <br />ARTICLE VI. SCHEDULE <br /> <br />6.1 Schedule. The Owner-Developer or Other Owners, as applicable, shall establish a <br />specific schedule for the development of and construction improvements on the Tract with the <br />end user(s). However, in lieu of and as the basis of that detailed schedule, the following work <br />program is anticipated: <br /> <br />· Initiation of a complete engmeenng study, including drainage and preliminary <br />infrastructure design. <br />· Detailed engineering design for Phase One, being all or a substantial part of the area <br />identified herein as Section One. This would include a rail connection to the main line <br />and a minimum spur connection to the first building anticipated, water and sanitary sewer <br />service, initial drainage, and detention to accommodate Phase One; <br /> <br />H-Final Development Agreement(622174_3).DOC - 4 - <br />