Laserfiche WebLink
Representative and information supplied to ENGINEER from Contractor, one set of record <br />drawings. These shall be reproducibles and shall be delivered within three months of completion <br />of last construction contract. <br />1.5.9 Conduct an inspection to determine if the Project is substantially complete and final <br />inspection to determine if the Project has been completed in accordance with the contract <br />documents and if each Contractor(s) has fulfilled all of his obligations thereunder so that <br />ENGINEER may approve, in writing, final payment to each Contractor. <br />1.5.10 Services after completion of the construction phase, such as inspections during any <br />guaranteed period and reporting observed discrepancies under guarantees called for in any <br />contract for the Project. <br />1.5.11 ENGINEER shall act as the OWNER's agent in obtaining necessary routine approvals and <br />routine permits from all governmental authorities having jurisdiction over the Project and such <br />approvals and consents from others as may be necessary for completion of the Project. Routine <br />permits include items such as highway or road crossings but do not include items requiring <br />services in addition to design, such as Waste Discharge Permit, Corps of Engineers Permit, <br />Environmental Impact Statements, etcetera. <br />SECTION 2 - ADDITIONAL SERVICES OF ENGINEER <br />2.1 General. If authorized in writing in separate instrument, by OWNER, ENGINEER shall <br />furnish or obtain from others, additional services of the following types which are not considered <br />normal or customary basic services; these will be additionally paid for by OWNER as indicated <br />in Section 5. <br />2.1.1 Services resulting from significant changes in general scope of the Projector its design <br />-7- <br />