My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2006-2951
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2006
>
O-2006-2951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:35:43 PM
Creation date
5/10/2008 5:43:43 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
10/23/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4 - PERIOD OF SERVICE <br />4.1 The provisions of 4.2 through 4.8, inclusive, and the various rates of compensation for <br />ENGINEER's services provided for elsewhere in this Agreement have been agreed to in <br />anticipation of the orderly and continuous progress of the Project through completion of the <br />construction phase. ENGINEER's obligation to render services hereunder will extend for a <br />period that may reasonably be required for the design, award of contracts and construction of the <br />Project including extra work and required extensions thereto. <br />4.2 The services called for in the preliminary phase will be completed and the report <br />submitted within a reasonable time following the authorization to proceed with that phase of <br />services. <br />4.3 After acceptance by OWNER of the preliminary documents and revised opinion of <br />probable Project cost, indicating any specific modifications of changes in scope desired by <br />OWNER, and upon written authorization from OWNER, ENGINEER shall proceed with the <br />performance of the service called for in the design phase, so as to deliver contract documents and <br />a revised opinion of probable Project cost for all authorized work on the Project within a <br />reasonable time after the authorization to proceed with that phase of services. <br />4.4 ENGINEER's services under the preliminary phase and design phase shall each be <br />considered complete when OWNER has accepted the submissions for the phases. <br />4.5 After acceptance by OWNER of the contract documents and ENGINEER's most recent <br />opinion of probable Project cost and upon written authorization to proceed, ENGINEER shall <br />proceed with performance of the services called for in the construction phase. The design phase <br />shall terminate and the services to be rendered thereunder shall be considered complete upon <br />commencement of the construction phase or upon cessation of negotiations with Contractor(s). <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.