Laserfiche WebLink
SECTION 4 - PERIOD OF SERVICE <br />4.1 The provisions of 4.2 through 4.8, inclusive, and the various rates of compensation for <br />ENGINEER's services provided for elsewhere in this Agreement have been agreed to in <br />anticipation of the orderly and continuous progress of the Project through completion of the <br />construction phase. ENGINEER's obligation to render services hereunder will extend for a <br />period that may reasonably be required for the design, award of contracts and construction of the <br />Project including extra work and required extensions thereto. <br />4.2 The services called for in the preliminary phase will be completed and the report <br />submitted within a reasonable time following the authorization to proceed with that phase of <br />services. <br />4.3 After acceptance by OWNER of the preliminary documents and revised opinion of <br />probable Project cost, indicating any specific modifications of changes in scope desired by <br />OWNER, and upon written authorization from OWNER, ENGINEER shall proceed with the <br />performance of the service called for in the design phase, so as to deliver contract documents and <br />a revised opinion of probable Project cost for all authorized work on the Project within a <br />reasonable time after the authorization to proceed with that phase of services. <br />4.4 ENGINEER's services under the preliminary phase and design phase shall each be <br />considered complete when OWNER has accepted the submissions for the phases. <br />4.5 After acceptance by OWNER of the contract documents and ENGINEER's most recent <br />opinion of probable Project cost and upon written authorization to proceed, ENGINEER shall <br />proceed with performance of the services called for in the construction phase. The design phase <br />shall terminate and the services to be rendered thereunder shall be considered complete upon <br />commencement of the construction phase or upon cessation of negotiations with Contractor(s). <br />-12- <br />