My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2006-2951
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2006
>
O-2006-2951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:35:43 PM
Creation date
5/10/2008 5:43:43 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
10/23/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sublet, or transfer his interest in this Agreement without the written consent of the other. <br />Nothing herein shall be construed as creating any personal liability on the part of any officer or <br />agent of any public body that may be a party hereto, nor shall it be construed as giving any rights <br />or benefits hereunder to anyone other than OWNER or ENGINEER. <br />SECTION 7 - SPECIAL PROVISIONS <br />7.1 OWNER and ENGINEER agree that this Agreement is subject to the following special <br />provisions which together with the provisions hereof and the exhibits and schedules hereto <br />represent the entire Agreement between OWNER and ENGINEER: they may only be altered, <br />amended or repealed by a duly executed written instrument. <br />7.1.1 The OWNER shall have right of approval and removal of Resident Project <br />Representative. <br />7.1.2 The OWNER shall receive written copies of all correspondence from the ENGINEER <br />related to the Project including daily construction progress reports. <br />7.1.3 ENGINEER shall have final responsibility for maintaining and preparing accurate record <br />drawings of all construction; said record drawings will be based on information supplied by <br />Contractor. Record drawings will be submitted to the OWNER (originals or sepias) within three <br />months after completion of construction contracts. <br />7.1.4 Both parties recognize that it may be advantageous to divide the Project into two or more <br />parts for bidding and construction. <br />7.1.5 The Engineer agrees to carry out and perform the services herein agreed to in a <br />professional and competent manner exercising usual degree of care and judgment of an ordinarily <br />-22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.