Laserfiche WebLink
WA Engineering & Surveying, Inc. `LA <br />11821 East Freeway Phone 713.450.1300 <br />Suite 400 Fax 713.450.1385 <br />Houston, Texas 77029 www.ijaengineering.com <br />October 4, 2006 <br />Mr. Stephen L. Gillette <br />Director of Public Works <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, Texas 77572-1115 <br />Re: Assignment for Engineering Services <br />City of La Porte <br />Waterline Replacement <br />Spenwick Subdivision <br />LJA Project E170-003 <br />Dear Mr. Gillette: <br />LJA Engineering & Surveying Inc. is pleased to submitthis assignment letterto provide engineering <br />services to the City of La Porte. The City desires to install new waterlines within the City's street <br />right-of-ways of the following streets within the Spenwick Subdivision: <br />• Bayer Street between Carlon Lane and Montgomery Lane (6" along the west side <br />of road right-of-way) <br />• Creel Court between Carlon Lane and End (4" along the east side of the road <br />right-of-way) <br />• Hillsdale Road between Ridgefield and Spencer Highway (6" along the east side <br />of road right-of-way) <br />• Belfast Lane between Andricks Road and Underwood Road (6" along the south <br />side of road right-of-way) <br />• Catlett Lane between Andricks Road and Crandall (6" along the north side of road <br />right-of-way) <br />• Montgomery Lane between Andricks Road and Underwood Road (6" along the <br />south side of road right-of-way) <br />Except for the Scope of Services, Basis of Compensation, and Schedule of Work set forth below, <br />the rights, duties, and obligations of LJA Engineering & Surveying and the City of La Porte shall be <br />as provided in the attached general services agreement which agreement is otherwise incorporated <br />herein and made a part of this assignment letter. Acceptance by the City of this assignment letter <br />shall constitute an amendment to said general services agreement. <br />The Scope of Services, Basis of Compensation, and Schedule of Work are outlined in the following <br />paragraphs: <br />SCOPE OF SERVICES <br />The scope of services can be divided into Preliminary and Design Phase, Bidding Phase, and <br />Construction Phases. The scope of each phase and/or services is defined as follows: <br />ao <br />