Laserfiche WebLink
Mr. Stephen L. Gillette <br />City of La Porte <br />October 4, 2006 <br />Page 3 <br />d. Review shop, laboratory and mill test of material and equipment and <br />promptly report to City any deficiencies noted. <br />e. Review shop and working drawings, furnished by contractors, for compliance <br />with design concepts and specifications and with the information given by the <br />contract documents. <br />f. Generate monthly and final estimates for payments to the contractor based <br />upon information supplied by the City. <br />g. Participate in company with the City's representative in a final inspection of <br />the project. <br />EXTRA SERVICES <br />a. Field surveying <br />COMPENSATION <br />LJA Engineering and Surveying Inc. proposes the compensation for the preliminary and design, <br />bidding, and construction phases be based upon lump sum fee as follows: <br />BASIC SERVICES <br />Preliminary/Design Phase <br />Bidding Phase <br />Construction Phase <br />Total Basic Services Cost <br />EXTRA SERVICES <br />Extra Service item compensation would be as follows: <br />Service Basis of Compensation <br />a. Surveying Invoice plus ten percent <br />service charge <br />$ 31,120.00 <br />2,460.00 <br />2,770.00 <br />$ 36,350.00 <br />Estimated Cost <br />$ 14,500.00 <br />Total Extra Services Estimated Cost $ 14,500.00 <br />