My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2006-2952
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2006
>
O-2006-2952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:20 PM
Creation date
5/10/2008 6:04:58 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
10/23/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />panel will be replaced. The wet well tops will be replaced and modified with sealed hatches. <br />Our assumption at this time is that the rehabilitation can be performed. If during the design <br />process we uncover factors that will require a complete reconstruction of the lift station, a <br />proposal will be provided for services associated with the change in project scope. <br /> <br />The wet well walls were briefly examined during the site visit and indicated light to moderate <br />deterioration of the wet well walls, however the walls are dirty and blast cleaning during the <br />rehabilitation process will provide additional information as to the wet well wall condition and <br />the need for grouting prior to applying any spray on coatings. <br /> <br />The control panel will require replacement as well as all controls and electrical components. <br />SCADA and remote alarm or information controls are not a part of this project. <br /> <br />From preliminary information supplied in the Manning report, it appears that there will be <br />sufficient depth to allow for acceptable pump cycle time and operation and at the same time <br />maintain adequate water levels over the submersible pump volutes. Run times and pump level <br />settings will be determined with the selection of the pumps during the design phase. <br /> <br />Access to L.S.#8 is provided by a newly constructed concrete driveway from King Williams <br />Drive with a concrete turn around near to the lift station. Additional site work and paving will be <br />required for access to the station and to improve site drainage and maintenance requirements. <br />L.S.#32 is accessed from a driveway from Underwood Road which appears adequate and <br />additional significant site work and paving is not anticipated. <br /> <br />The City has budgeted $225,000 and $200,000 for the construction cost and engineering for the <br />rehabilitation of lift stations No.8 and 32 respectively. These budgets appear adequate based on <br />our previous experience with similar projects and will be evaluated and updated as the project <br />progresses. <br /> <br />This proposal addresses the engineering services that CMI will provide the City of La Porte <br />during the Design and Construction Phases. CMI will utilize an electrical subconsultant for the <br />electrical components and control system designs. Since it is anticipated that all work will be <br />confined to the existing station, no surveyor geotechnical work is included for this project. <br /> <br />SCOPE OF SERVICES <br /> <br />I. DESIGN ENGINEERING PHASE <br /> <br />A. Perform field reconnaissance and partial survey of the site and immediate vicinity to <br />obtain information on surface features and any other information that would impact <br />construction. A detailed topographic survey will not be performed. A geotechnical <br />evaluation will not be performed. <br /> <br />B. Research and gather existing relevant data on the project such as existing utility <br />information. <br /> <br />Page 2 of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.