Laserfiche WebLink
<br />eM FIRM: <br /> <br />Project Name: <br />PROJECT NO. <br />CONSTRUCTION PHASE SERVICES <br /> <br /> <br />Y CONTRACT <br /> <br />ASSIGNMENT <br /> <br />PROJECT DURA liON <br /> <br />CNSTRUCTION PHASE SERVICES <br /> <br />PROJECT MANAGER <br /> <br />DESIGN ENGINEERfTECH <br /> <br />CONSTRUCTION MANAGER <br /> <br />ADMINISTRATIVE ASSISTANT <br /> <br />EXPENSES <br /> <br />TOTAL CM&llABOR COSTS <br /> <br />COSTS <br /> <br />TOTAL CMI LABOR AND COST <br /> <br />CONSTRUCTION CONTRACT PRICE <br /> <br />% OF CONTRUCTION COST <br /> <br />CLAUNCH AND MILLER <br /> <br />City of La Porte. Lift Station #8 and 32 Rehabilitation <br />GFS NO. <br /> <br /> STRAIGHT TIME <br />PROJECT PROJECT CONSTRUCTION ADMINISTRATIVE <br />MANAGER DESIGN ENGNR MANAGER ASSISTANT <br />45,00 30.00 40.00 15.00 <br />3.05 3.05 3.05 3.05 <br />137.25 91.50 122.00 45.75 <br />NO NO NO NO <br />131.25 91.50 122.00 57.50 <br /> <br /> <br />$14,530.00 <br /> <br />$0.00 <br /> <br />$14,530.00 <br /> <br />$350,000.00 <br /> <br />4.15% <br />