My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2003-1501-ZZ Tabled 6/9, 6/23, 7/14/03
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2003
>
O-2003-1501-ZZ Tabled 6/9, 6/23, 7/14/03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:10 PM
Creation date
6/11/2008 4:03:12 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/9/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Port of Houston Authority <br />5/15/03 P&z Meeting <br />Page 2 of 4 <br /> <br />Analvsis: <br /> <br />The development in a PUD zoning district requires that an application <br />for a general plan or site plan shall be filed and processed <br />simultaneously with the Special Conditional Use Permit. Upon <br />approval of the plan and SCUP, the Port would be authorized to <br />submit a Major Development Site Plan. <br /> <br />In addition to performance standards, there are a number of development <br />standards that are specified by the Zoning Ordinance. These standards <br />are applicable to all P.UD. developments. Section 106-659 of the Code <br />of Ordinances establishes the following criteria for review of the <br />development projects within a P.UD. zoning district: <br /> <br />Land Use - The City's Comprehensive Plan shows this area <br />developing with industrial uses. The existing land uses of nearby <br />properties are primarily industrial (the Port Authority's main facility); <br />however, there are single-family residences south of the undeveloped <br />"E" Street right-of-way. <br /> <br />In general, high intensity uses should be adjacent to each other. When <br />higher uses abut residential uses buffering must occur to protect the <br />health, safety, and general welfare of neighborhoods. As a part of the <br />Port's site plan, they will incorporate a berm, landscaping, and a <br />masonry wall to protect the adjacent residential from the activities of the <br />proposed pre-check facility. In addition, the undeveloped wooded "E <br />Street" right-of-way will remain in tact. <br /> <br />Transportation - Being located along Barbour's Cut Boulevard, a <br />primary arterial road and major truck route, provides more than <br />adequate accessibility for circulation of truck traffic. There should be <br />very limited impact on traffic flow within the vicinity even after full <br />implementation of the proposed project. <br /> <br />The two private drives and truck parking areas will be designed and <br />constructed in conformance with City Standards. Since trucking <br />movement is the primary function of the facility, access management <br />and circulation should be the top priority while designing the project. <br />Driveways connecting directly onto the roadway should be minimized <br />to avoid traffic congestion and other delays caused by turning <br />movements for the eighteen-wheelers entering and exiting the facility. <br />In addition, the pre-check facility will lessen the amount of time trucks <br />spend idling on Barbour's Cut Blvd. This results in fewer NOx being <br />released in the air. <br />
The URL can be used to link to this page
Your browser does not support the video tag.