Laserfiche WebLink
<br />Smrunary of <br /> <br />Huitt-Zollars, Inc.'s Proposal <br /> <br />for <br /> <br />Professional Engineering Services <br /> <br />to the <br /> <br />City of La Porte <br /> <br />Project: Fairrnont Parkway Hike and Bike Trail <br /> <br />Scope of Services includes <br />Surveying, Abstracting, Preliminary Engineering, Final Design, Bidding and Construction Phase Services <br /> <br />Compensation breakdown: <br /> <br />Design <br />Preliminary Alignment <br />Final Design <br />Bidding Phase <br />Construction Phase <br /> <br />Total Design <br /> <br />$ 16,700 (lump sum) <br />$ 43,000 (lump sum) <br />$ 4,200 (lump sum) <br />$ 12,900 (lump sum) <br />$ 76,800 <br /> <br />Surveying <br />Abstracting <br /> <br />$ 56,200 (lump sum) <br />$ 4,500 (HNTE) <br /> <br />Total Project Budget is $ 137,500.00. <br /> <br />Jmle 23, 2008 <br /> <br />Huitt-Zollars, Inc. <br />1500 Dairy Ashford, Suite 200 <br />Houston, Texas 77077 <br />Phone 281-496-0066 <br />Fax 281-496-0220 <br />