Laserfiche WebLink
<br />Task 6.0 - Drainage Plan <br /> <br />A major focus of the study will be to develop a drainage plan to serve the TIRZ study area. The plan will identify <br />possible solutions to serve the drainage needs for future development in the study area. The plan may recommend <br />flood control and drainage improvements such as channel improvements, regional and on-site detention, storm <br />sewer systems, culverts, or combinations thereof. The regional drainage solutions will consider the ability to <br />incorporate multi-use public facilities such as parks and trails. Preliminary construction costs will be prepared for <br />the drainage plan. Drainage facilities related to the planned roadway improvements in the study area will also be <br />presented in the plan. The deliverable will be graphically presented to illustrate the plan components. <br /> <br />Task 7.0 - Drainage Plan Report <br /> <br />The report will culminate in a report that graphically presents the drainage plan for the TIRZ study area. The <br />product deliverable will be graphically based with exhibits, text, and tables. Five copies (5) copies of the draft <br />Drainage Plan will be provided to the City for review and comment. Fifteen (15) copies of the final Drainage Plan <br />will be provided to the City for the final deliverable. <br /> <br />Page 3 of 3 Pages <br />(Exhibit SR-Al - Study Objectives, Background and Scope of Work) <br />