My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2002-2542
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2002
>
O-2002-2542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:07 PM
Creation date
11/24/2008 3:57:23 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/18/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCOPE OF WORK <br />CLP Project No. 2002-5201 <br /> <br />CONCRETE SLAB FOR CENTRAL PARK OUTDOOR SKATING RINK <br /> <br />Contractor shall provide materials, supplies, labor and equipment to construct a <br />concrete slab to serve as a roller skating rink, according to site plan drawing and <br />specifications included herein, at Central Park, 618 San Jacinto, La Porte, Texas. <br /> <br />Border posts for side walls and fencing for this project to be provided by Owner. <br />Owner shall be responsible for placement of all border posts on part of slab that will be <br />overlayed on the existing slab. Contractor shall be responsible for placement of all border <br />posts in the new portion of the slab construction as shown on accompanying drawing. <br />Owner shall place border posts on existing slab by use of floor flange plates, anchored <br />and bolted to the existing slab. Plates shall be installed and posts set perpendicular prior <br />to the Contractor's preparation for slab pouring. Contractor shall place forms, <br />reinforcement, chairs, and any other materials needed for slab placement, as well as the <br />fence posts at the new slab section, while border posts are in place. Contractor shall <br />check post placement for perpendicular, prior to pouring slab and correct if necessary. <br />After concrete slab is poured and cured, Owner will be responsible for installation of <br />border walls and fencing. <br /> <br />The placement of the posts will not be paid for directly but shall be incidental to Item 2 <br />"SUBGRADE PREPARATION FOR SLAB" <br /> <br />Performance and Payment Bonds shall be required for these projects. <br /> <br />Scope of Work 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.