Laserfiche WebLink
<br />Exhibit A - RSDE Scope <br />Hurricane Ike Disaster Response <br /> <br />Information collected will include digital photographs of every damage item described and <br />GIS information. Images will be date-stamped. Data entry will also be date-stamped. <br />. At the end ofthe day, Teams will log the asset(s) assessed and upload the collected <br />information to a central data management application. <br />. The data download will be QA/QCed daily by technical specialists with the ability to add/edit <br />or delete information as needed. The QA/QC review will also verify that the photographs <br />correspond with other data collected and recorded. <br />. The cleansed data will be loaded into a central Geodatabase <br />· In the event that there is a need to re-inspect or assess the buildings, the re-assessment team's <br />data collection tool(s) will be pre-loaded with the information gathered by the preceding <br />team. <br />· Note that the protocols used by the teams will have a direct impact on the quality and <br />consistency of the data being gathered <br />· HNTB will coordinate with the City of La Porte to determine the method, format and <br />frequency of reporting of collected assessment information. Final format and type of <br />information will be developed based upon the City's needs. <br /> <br />v. Compensation <br /> <br />To accomplish the scope of services in this task order, rates included in Attachment B will be <br />utilized. Expenses for all direct costs associated with the project will be reimbursed by the City. <br />Deployed employees will require lodging, transportation/travel, and subsistence, field supplies, <br />safety equipment, etc. at approved Federal GSA/JTR rates. <br /> <br />For estimation purposes, the following will serve as a guide to determining the amount of the <br />contract value for these services. <br /> <br />1. Residential inspection - 2 hours per structure performed by a two-person team (estimated <br />at $123,000 for 562 structures). A cost/structure of $320.28/structure. <br />2. Oversight and management ofthe field personnel to provide coordination, training, <br />interaction with City personnel and other agencies (estimated at 27,000) <br />3. Sanderson Knox and Co. will provide construction cost estimates, evaluation of central <br />appraisal district values, and other required data (estimated at $15,000) <br />4. Direct expenses (estimated at $15,000) <br />Total = $180,000 <br /> <br />VI. Services not included <br /> <br />1. HNTB's services are limited to the RSDE inspections for 450 homes described in this <br />scope of services. Only the services defined are included at a time and materials basis. <br />The fee estimate included is not a guarantee, as actual effort in the field may change due <br />to actual site conditions and coordination efforts required. HNTB will endeavor to work <br />quickly and efficiently. <br />2. Infrastructure inspections/evaluations are not included as part of this task order. <br />3. Grant applications ar~ not included as part of this task order. <br /> <br />Page 3 of3 <br />