My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2009-3131 TABLED indefinitely Re:Main Street Overlay,exterior standards-Main Street District
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2009
>
O-2009-3131 TABLED indefinitely Re:Main Street Overlay,exterior standards-Main Street District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:27 PM
Creation date
5/11/2009 9:53:41 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/13/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />New, Renovation, or Demolition <br /> <br />P & Z, 2-19-09 <br /> <br />Design Certificate <br /> <br />acceptable designs and ask questions before you begin the process of planning your project, as well as <br />familiarize the MS DART with the general nature of your project. <br /> <br />2. Applications for a Main Street Design Certificate (MS DC) must be consistent with the City's Building, <br />Zoning, and Fire Codes and go through the standard permitting process. Receipt of a Main Street Design <br />Certificate is required before the Permitting Division or Planning Department may approve your plans. <br /> <br />3. Submit your completed Main Street Design Certificate packet to the Main Street Development office at <br />604 W. Fairmont Parkway. The packet should include the following: <br /> <br />. A completed Main Street Design Certificate Application form <br /> <br />. A scaled drawing by the project architect or design professional of all proposed work. <br /> <br />. Include samples - such as paint samples, fabric swatches, sign material, etc. Provide any additional <br />items that will enable the MS DART to envision the finished project. <br /> <br />. Furnish photographs of the building's exterior, and any other site locations that are included in your <br />application (photos are also required upon completion) along with historic photographs of the <br />building. <br /> <br />. Additional submissions may be requested if deemed pertinent to design review decisions. <br /> <br />. Project estimates and any other items that will be helpful in conveying your vision to MS DART <br /> <br />FACTORS CONSIDERED FOR CERTIFICATION <br />Before approving an application, the MS DART must find that the application satisfies the following general <br />criteria: <br /> <br />. The architectural and historic integrity of an individual historic structure is preserved; <br />. New buildings or additions should be designed to be compatible with the range of architectural styles <br />found on the north side of the 300 block of Main Street - from the late 1800's to the 1950's; <br />. Existing structures should either convert to their original historic condition or be renovated to resemble <br />their current look; <br />. The overall character of the Main Street District is protected and enhanced. <br /> <br />The Main Street Design Guidelines & Resource Material have been compiled to help explain in general terms <br />the aesthetics the MS DART is responsible for in the Main Street District. <br /> <br />REVIEW & ApPROVAL PROCESS <br />1. Upon receipt, the Main Street Coordinator will review the packet to verify all pertinent information is <br />enclosed. Once the completed packet is received it will be forwarded to the MS DART for their <br />recommendation. If packet is incomplete, you will be notified and may be asked to pick it up and return it <br />completed. <br /> <br />2. After due consideration, the MS DART will approve or disapprove the application by majority vote, and <br />be signed by the City Manager's office. The best assurance you have for a project to be approved is to <br />work closely with the MS DART at every juncture of your project. In an effort to make it feasible for you <br />to resubmit a successful packet, they will state the reasons it was denied. The decisions made by the Main <br />Street Design Assistance Review Team may be appealed to the Planning and Zoning Commission if <br />resolution is not obtained. <br /> <br />3. Upon receipt of your Main Street Design Certificate, the Permitting Division and Planning Department <br />may proceed with any applications you have on file with them. They cannot approve permits without a <br />design certificate. <br /> <br />City of La Porte - Main Street Program <br /> <br />20f5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.