My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2009-3135 Pipeline Permit requested by Shell Chemical, LP/12” Dry Gas Pipeline
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2009
>
O-2009-3135 Pipeline Permit requested by Shell Chemical, LP/12” Dry Gas Pipeline
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:27 PM
Creation date
5/11/2009 12:01:26 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/27/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Texas Bay Area 12-inch Pipeline <br /> <br />CITY OF LA PORTE, TEXAS <br />ADDENDUM TO PIPELINE PERMIT APPLICATION <br /> <br />As required by the City of La Porte's Ordinance #2004-2755, Sec. 102-235, Application <br />tor Pem1it. Shell Pipeline Company LP, on behalf of Shell Chemical LP ("Permittee"), <br />agrees to the following terms and conditions: <br /> <br />Item (10) .. The pipeline will comply with the applicable standards required by this article <br />as well as all applicable federaL state and local laws and regulations. <br /> <br />Item (11) .. Permittee shall. at any time in the future, where such pipeline or portion <br />thereof crosses or is laid within, under or across any street, road or utility right-of-way, <br />drainage way or public way existing or projected at the time the permit is issued, <br />reposition sllch pipeline (which shall include lowering or raising the pipeline) at the <br />Permittee's sole expense, when the eity reasonably requires such action incidental to <br />public construction or public improvement Construction, maintenance and improvement <br />of streets, water lines, sanitary sewer lines, storm sewers, ditches and public utilities. The <br />city shall give the Permittee prior written notice of the need tor repositioning location, <br />and such notice shall be mailcd certified mail, return receipt requested, to the Pennittee as <br />designated in the application. The Permittee shall have six months to complete such <br />repositioning. <br /> <br />Item (12) .. Permittee shall notify the director at least 48 hours prior to performing any <br />scheduled repairs or maintenance on the pipeline. For unscheduled emcrgency repairs or <br />maintenance, taken to protect the public health, safety or welfare, the Permittee shall <br />notify the city police department dispatcher as soon as practical but no later than one hour <br />after commencing repairs or maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.