Laserfiche WebLink
<br /> <br />CLAUNCH & MILLER, INC. <br />Engineering Consultants <br /> <br />ATTACHMENT "A" <br /> <br />October 30, 2000 <br /> <br />Mr. Steve Gillett <br />Director of Public Works <br />P.O. Box 1115 <br />La Porte, TX 77572-1115 <br /> <br />RE: Engineering Services for Waterline Improvements on Belfast Road and Piney Brook Drive <br />and Sanitary Sewer Line Rehabilitation on Rustic Rock Road <br /> <br />Dear Mr. Gillett: <br /> <br />Claunch & Miller, Inc. (CMI) is pleased to submit this proposal for providing engineering services <br />on the above referenced project. <br /> <br />DESCRIPTION OF PROJECT <br /> <br />Water Line Project <br />The project consists of waterline improvements in Fairmont Park, Section I as follows: <br /> <br />Belfast- This improvement includes the replacement of an existing 6" waterline with a new <br />8" waterline along Belfast Street from Farrington Blvd. to Valley Brook Drive <br />(approximately 1,950'). This proj ect also includes the replacement of all of the existing <br />sidewalk on the north side of Belfast for this segment. <br /> <br />Piney Brook Drive- This improvement involves the replacement of an existing 6" waterline <br />with an 8" waterline along Piney Brook Drive also involving sidewalk replacement from Old <br />Orchard to Carlow (approximately 1,050 L.F.). <br /> <br />Catlett and Bi~ Island Slou~h - This improvement involves the replacement of an existing <br />8" waterline crossing Big Island Slough. This involves replacing the line crossing under the <br />ditch. <br /> <br />The preliminary estimated construction cost for the water line improvements is $279,910.00 <br /> <br />Page I of7 <br /> <br />3701 Kirby Drive, Suite 860. Houston, Texas 77098. (713) 524-7113 <br />