Laserfiche WebLink
<br />SH 146 frontage roads begin at the intersection of McCabe Road with SH 146, but the <br />main lanes and frontage road merge just north of the McCabe Road. At the intersection of <br />McCabe Road with the SH 146 main lanes, northbound SH 146 is free flow and consists <br />of a through lane and a through/right-turn lane. The westbound approach of McCabe <br />Road consists of a right-turn lane. Concrete barriers run down the center of SH 146, so <br />McCabe currently dead-ends into either side of SH 146. At the intersection of McCabe <br />Road with the SH 146 northbound frontage road, the eastbound approach of McCabe <br />Road consists of a shared left-turn/through lane, and the westbound approach of McCabe <br />Road consists of a shared through/right-turn lane. <br /> <br />The intersection of McCabe Road at Broadway Street is an unsignalized T-intersection. <br />The eastbound approach of McCabe Road provides a shared left-turn/through/right-turn <br />lane. The northbound approach of Broadway Street provides one shared left-turn/through <br />lane. The southbound approach of McCabe Road consists of a shared through/right-turn <br />lane. <br /> <br />Peak hour Turning Movement Counts (TMCs) were collected during the proposed arrival <br />and dismissal hours of the schools at the intersections of McCabe Road with SH 146 and <br />with Broadway Street. The TMCs are included in Appendix A. <br /> <br />Future Conditions <br />The replacement facility for Bayshore Elementary School will be constructed north of <br />McCabe Road, east of SH 146. Construction of the elementary school is planned to begin <br />in 2009 and be completed by spring 20 10. The proposed site plan for Bayshore <br />Elementary School is provided in Figure 2. Classroom hours at the new school will be <br />from 8:00 AM until 3:00 PM. <br /> <br />3 <br />