My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2010-3216 amending Chapter 34-Environment
LaPorte
>
Legislative records
>
Ordinances - GR1000-05
>
2010's
>
2010
>
O-2010-3216 amending Chapter 34-Environment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:29 PM
Creation date
1/30/2010 3:06:18 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
1/25/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(d) A bond shall not be required if all structural controls will be completed and the <br />certifications required by section 34-261 (a) will be filed before any additional <br />construction, including the construction of streets and utilities, commences. <br /> <br />(e) Ifthe project is on public property, the owner or operator shall also provide a payment <br />bond to the city to secure the payment of mechanics, materialmen and suppliers liens. <br /> <br />Sec. 34-242. Issuance of SWQ permit. <br /> <br />(a) The city engineer shall review the SWQ permit application and the SWQMP and either <br />approve or deny the application based on compliance with the applicable provisions of <br />this article and the design manual. The city engineer shall also deny the application if any <br />statement made in the application or any documents submitted therewith were known to <br />be false or should have been known to be false by the applicant. <br /> <br />(b) The SWQ permit shall be issued to the owner ofthe land covered by the SWQ permit and <br />shall run with the land and be binding on all subsequent owners unless responsibility for <br />compliance has been transferred pursuant to section 34-262 ofthis Code. <br /> <br />(c) The applicant may seek a hearing for reconsideration of the denial of a SWQ permit <br />pursuant to section 34-197 of this article by filing a written request with the city engineer <br />not later than the tenth day after the applicant has been notified that the application has <br />been denied. <br /> <br />(d) The granting of a SWQ permit does not imply that federal or state storm water <br />management requirements or criteria have been met. <br /> <br />Sec. 34-243. Amendment of SWQ permit. <br /> <br />(a) An amendment to the SWQ permit is required in the following events: <br /> <br />(I) The person responsible for compliance with the SWQ permit changes either as a <br />result of: <br /> <br />(i) The transfer of ownership of the parcel to a different person; or <br /> <br />(ii) The transfer of the obligation to comply with this Code to a third-party <br />permittee pursuant to section 34-262 ofthis Code. <br /> <br />(2) Any substantial deviation is made to a structural control or any change is made to <br />a non-structural control in the SWQMP on which the SWQ permit is based; or <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.