Laserfiche WebLink
<br />Sec. 34-302. Monitoring required. <br /> <br />(a) Every type 1 and type 2 facility that has storm water discharges associated with industrial <br />activity shall undertake all monitoring: <br /> <br />(1) Required by an individual NPDES or TPDES storm water permit ifthe facility <br />has an individual storm water permit; <br /> <br />(2) Required by a general NPDES or TPDES storm water permit, other than TPDES <br />permit number TXR050000 if the facility has coverage under such a permit; or <br /> <br />(3) Required by TPDES permit number TXR050000, or any successor permit thereto, <br />if neither (i) or (ii) above apply. <br /> <br />(b) If a type 1 facility does not have storm water discharges associated with industrial <br />activity, the facility annually shall analytically monitor and analyze storm water discharges from <br />its facility during a representative storm event on an outfall-by-outfall basis for each of the <br />following parameters: <br /> <br />(1) Any pollutants limited in an existing NPDES or TPDES permit for the facility; <br /> <br />(2) Total oil and grease; <br /> <br />(3) Chemical oxygen demand; <br /> <br />(4) pH; <br /> <br />(5) Biochemical oxygen demand, five-day; <br /> <br />(6) Total suspended solids; <br /> <br />(7) Total phosphorus; <br /> <br />(8) Total Kjeldahl nitrogen; <br /> <br />(9) Nitrate plus nitrite nitrogen; <br /> <br />(10) Any other discharges required to be monitored under Section 122.21(g)(7)(iii) and <br />(iv) of Title 40 ofthe CFR; <br /> <br />(11) Any pollutants for which effluent limitations are imposed in the city's storm water <br />permit for its MS4; and <br /> <br />28 <br />