My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-29-1994 Public Hearing and Regular Meeting of the La Porte Planning and Zoning Commission
LaPorte
>
City Secretary
>
Agendas 1000-01
>
Planning and Zoning Commission
>
1990's
>
1994
>
09-29-1994 Public Hearing and Regular Meeting of the La Porte Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2010 3:54:25 PM
Creation date
3/16/2010 3:51:05 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agendas
Date
9/29/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />Phase One: <br />Phase One will be the erection of the main administrative building and it's parking <br />lot and will include a fifty foot area around the building. From McCabe Road <br />visitors will enter at the south east end of the property. The main building should <br />barely be visible to the community. The building will be approximately 150 feet off <br />the main road, the parking lot will be to one side of the building. The parking lot <br />will hold a minimum of 10 automobiles and be approximately 50' x 60'. The <br />administrative building will be a two story building (at this time we are reviewing <br />plans to possibly construct a custom log building). Groundbreaking will commence <br />within four months of purchase of the property and completion of phase one will be <br />within 14 months of the purchase date. <br />Phase Two: <br />Within 12 months of the completion of the main building, construction of a portion <br />of the lake will begin. Dirt from this construction will be used to raise buildings and <br />projects above the flood plan. This will also provide the necessary dirt for the <br />construction of the berm. <br /> <br />Phase Three: <br />Phase three will begin within 12 months of the completion of the main building and <br />completed within one yeaz. Phase three is the construction of the training tower, <br />this will be the tallest structure at 75 feet above the flood plan. The location of the <br />tower will be near the center of the property. This should reduce the visibility of the <br />tower by the community. It should be concealed by the natural heighth of the trees <br />located throughout the property. The trees will best serve their two-fold purpose <br />here by obscuring any noise, giving shade and providing a more relaxing atmosphere <br />for students. <br />Phase Four: <br />Phase four will begin within 18 months of the completion of the main building and <br />completed within two yeazs. These phases aze the erection of 6 (approximately 400 <br />square feet) classrooms with training projects next to them. Training projects are <br />mockups of different types of responses which a responder may come across. Each <br />• project site will be approximately 1600 sq. ft. <br />~CHi~~f D <br />
The URL can be used to link to this page
Your browser does not support the video tag.