Laserfiche WebLink
Boncosky Trucking T~inal <br />5/1/97 - P&Z Meeting <br />Page 2 of 3 <br />Analysis: Staff has reviewed the "Amended" General Plan and found it <br />complies with City requirements. A copy of the General Plan <br />Checklist follows this report. <br />Any outstanding items will be reviewed at the preliminary and <br />final plat submittal of each of the development phases. They are <br />outlined below: <br />The 6.3192 acre <br />• Water and sewer extensions are <br />• Additional water line information is needed-. This includes <br />construction/design information and verification of the water <br />line easement north of the truck terminal site. <br />• Drainage plans shall be approved by Harris County and the <br />. ..City of La Porte. <br />Vl~l~ b~ t'eq~zired prigrto authorizat~an tc proceed ands pnoFto <br />buldang;permit being zs~ued. <br />• Proposed water line easements both on and off site need to be <br />