Laserfiche WebLink
<br />CITY OF LA PORTE, TEXAS <br /> <br />Agreed Upon Procedures - Five Points Town Center Project (Continued) <br />September 21, 2010 <br /> <br />lOB. Finding <br /> <br />During our review of the various transactions and support documentation we noted instances where there <br />was no formal written documentation of the project as a whole and the reasons for and reasoning behind <br />certain actions taken to bring the project to completion. <br /> <br />lOB. Recommendation <br /> <br />While not legally required, we recommend the EDC consider utilizing project development plans for <br />future development projects. Such a document, updated as needed, would act as a way to clarify the <br />project to stakeholders, act as a guide during the project to ensure it stays on task, serve to inspire analysis <br />of changes to the original project, limit project creep, and act as a reference at the end of the project to <br />evaluate whether the initial goals were met. In particular, projects or portions of projects that could be <br />viewed as primarily benefitting private parties should be especially documented with respect to their <br />public benefit. Documentation of the purpose of funds provided to private parties is required as of April I, <br />2009 under Sections 40(b) of the Economic Development Act and would serve to make the purpose of <br />such transactions more transparent to the public. <br /> <br />This detailed project development plan should address some or all of the following: <br /> <br />· The public purpose or use that is to be served by the project <br />. A detailed scope of the project <br />· An analysis of the impacts, both positive and negative, on the City <br />· Cost versus benefit analysis ofthe project in objective terms (jobs created, value added, capacity <br />increased, etc.) <br />· A description of the project steps from project planning through completion <br />· Description of and reasons for significant changes to the project as originally conceived <br />· If the individual project is part of a larger project or master plan, a description of how the former <br />relates to the latter <br />· Detailed costs for the project construction and anticipated maintenance and operating costs after <br />completion <br />· Contingency plans for nonperformance on the part of vendors, contractors, and partners involved <br />· A [mal project report detailing wrap up ofthe project and critique of its execution <br /> <br />10C. Finding <br /> <br />In the review of the promissory note and deed of trust for the loan to East A, it was noted that proof of <br />insurance was not provided or retained and monthly interest payments were provided in a lump sum <br />rather than monthly. <br /> <br />lOCo Recommendation <br /> <br />The City and EDC should ensure that policies and procedures are in place to monitor contracts between <br />the City/EDC and contractors/vendors so that all requirements are met. <br /> <br />20 <br />