My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-12-19 Drainage and Flooding Committee Meeting Minutes
LaPorte
>
City Meetings
>
Minutes
>
Drainage and Flooding Committee
>
2019
>
08-12-19 Drainage and Flooding Committee Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:44:53 AM
Creation date
9/10/2019 12:36:59 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Minutes
Date
8/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rahman, Flood Mitigation Director for HC Precinct 2 Commissioner Garcia, provided <br />background on the prior Sens Road project along Spencer Highway. Member Earp noted <br />flooding following the Sens Road development was still flowing into residents' yards and was <br />worse than previously and asked that detention be reviewed. Mr. Raman agreed to look at <br />the pond and report at the next meeting. <br />(b) Presentation, discussion, and possible action regarding the status of current drainage <br />projects. [Lorenzo Wingate, City Engineer] <br />Lorenzo Wingate, City Engineer, noted that TDEM has listed five of the City's eight projects <br />(Brookglen; Bayside Terrace; Lomax/F101-03-00; Little Cedar Bayou Park, F216 Phase II1; and <br />Battleground Estates) as "alternates" (as opposed to "primary" or to not being considered at all) <br />and funding possibilities will not be known for a time, as long as perhaps a year, as allocations <br />and re -allocations are made. Mr. Wingate agreed to find out if TDEM had ranked the "alternate" <br />projects and said the other projects on the list were under construction in some part. Member <br />Engelken asked that the spreadsheets henceforward include columns for percentage complete, <br />whether the projects were on or off track, and which department(s) were responsible for each. <br />(c) Presentation, discussion, and possible action regarding additional drainage concerns <br />and provide staff with direction. [Lorenzo Wingate, City Engineer] <br />Lorenzo Wingate, City Engineer, noted street flooding on Roseberry in even a very insignificant <br />rain event that recently occurred on July 22, categorizing it as "nuisance flooding" that dispersed <br />very quickly but worth review for alleviation, such as at Carlow at Roseberry. The Committee <br />consented to further evaluation of the Roseberry drainage system to determine any necessity <br />for potential improvements. <br />3. Set date for next Drainage and Flooding Committee Meeting <br />The next meeting date was set for September 9, at 5:00 p.m. <br />4. Committee Comments <br />Page 2 of 2 <br />August 12, 2019 - Drainage and Flooding Committee Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.