Laserfiche WebLink
(2) <br />Commercial (Non -Residential) Building Permit Fee Schedule <br />Total Valuation of <br />Fee <br />Project <br />1100.00 <br />$1,000.00 and less <br />$20.00 <br />$1,001.00 to <br />$20.00 for the first $1,000.00 plus $7.50 for each additional thousand or fraction thereof, to <br />$50,000.00 <br />and including $50,000.00 <br />$50,001.00 to <br />$387.50 for the first $50,000.00 plus $6.00 for each additional thousand or fraction thereof, <br />$100,000.00 <br />to and including $100,000.00 <br />$100,001.00 to <br />$687.50 for the first $100,000.00 plus $4.50 for each additional thousand or fraction thereof, <br />$500,000.00 <br />to and including $500,000.00 <br />$500,001.00 and up <br />$2,487.50 for the first $500,000.00 plus $3.50 for each additional thousand or fraction <br />(b) Sewer (New, repair or replacement), each ..... <br />thereof <br />Plan Review Fee <br />50% of Permit Fee <br />Reinspection fee <br />$35.00 <br />MOVING PEE Moving Fees <br />(1) Fee for the moving of any building or structure <br />$150.00 <br />(2) House/building pre -relocation inspection fee <br />1100.00 <br />Article 111. Plumbing Code <br />(7) Residential Plumbing Permits <br />(a) Permit Fee — all structures <br />10.00 <br />(b) Reinspection Fee — all structures <br />10.00 <br />(2) Commercial Plumbing Permits <br />(a) Fixtures/drains/traps, each ..... <br />3.75 <br />(b) Sewer (New, repair or replacement), each ..... <br />7.50 <br />(c) Septic tank/seepage pit or drain field, each ..... <br />15.00 <br />(d) Water heater, each ..... <br />3.75 <br />(e) I Gap piping system (One to four outlets, flat fee) ..... <br />7.50 <br />