My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2010-3298 provide bicycle-pedestrian easements at various sites on Harris County Flood Control District property
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2010's
>
2010
>
O-2010-3298 provide bicycle-pedestrian easements at various sites on Harris County Flood Control District property
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:30 PM
Creation date
11/18/2010 3:37:45 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
11/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The District has advised the City and the City is aware that portions of the Property located along <br />HCFCD Units B 106-00-00, B 109-00-00, B509-03-00, and F216-00-00 were acquired for flood control <br />and drainage purposes. The District presently uses said portions of the Property upon which the <br />Trail is to be constructed for maintenance of HCFCD Units B 106-00-00, B 109-00-00, B509-03-00, <br />and F216-00-00, and the District contemplates future use of the Property for widening of the <br />drainage facility and for other flood control and drainage improvements as the need for the same <br />may arise and funds may be available. The District hereby expressly reserves to itself, its officers, <br />employees, agents and contractors, the right to enter upon said Property and Trail at any time for any <br />purpose necessary or convenient in connection with drainage and flood control work, to flood said <br />Property and Trail, and to make such other use of said Property and Trail as may be necessary or <br />desirable in connection with drainage and flood control, and the City shall have no claim for damages <br />of any character on account thereof against the District , or any officer, employee, agent, or <br />contractor thereof. The District shall have no responsibility to replace or repair any portion of the <br />Trail that is damaged in the course of such flood control activities. If the Trail or other structures <br />appurtenant thereto constructed by the City, including but not limited to, railings or low water <br />crossings, are damaged by the District during drainage or flood control activities or by the flow of <br />water in the channel, the District reserves the right not to allow the City to rebuild the Trail or replace <br />the structures appurtenant thereto if to do so would in the Director's opinion impede the flow of water <br />of water in the channel. The District further reserves the right to remove portions of the Trail from <br />time to time as the Director determines necessary or convenient to accommodate channel <br />improvements, and further, to not permit the City to rebuild same. The District makes no <br />representation as to the suitability of the soils or the stability of the channel bank for the City's <br />intended purposes. The City understands that in the event of a failure involving distinct elements of <br />the Trail's construction, the District may not permit the City to replace those elements. <br /> <br />Is hereby amended to read: <br /> <br />The District has advised the City and the City is aware that portions of the Property were acquired for <br />flood control and drainage purposes. The District presently uses said portions of the Property upon <br />which the Trail is to be constructed for maintenance of the Property and the District contemplates <br />future use of the Property for widening of the drainage facility and for other flood control and <br />drainage improvements as the need for the same may arise and funds may be available. The District <br />hereby expressly reserves to itself, its officers, employees, agents and contractors, the right to enter <br />upon said Property and Trail at any time for any purpose necessary or convenient in connection with <br />drainage and flood control work, to flood said Property and Trail, and to make such other use of said <br />Property and Trail as may be necessary or desirable in connection with drainage and flood control, <br />and the City shall have no claim for damages of any character on account thereof against the District <br />, or any officer, employee, agent, or contractor thereof. The District shall have no responsibility to <br />replace or repair any portion of the Trail that is damaged in the course of such flood control activities. <br />If the Trail or other structures appurtenant thereto constructed by the City, including but not limited <br />to, railings or low water crossings, are damaged by the District during drainage or flood control <br />activities or by the flow of water in the channel, the District reserves the right not to allow the City to <br />rebuild the Trail or replace the structures appurtenant thereto if to do so would in the Director's <br />opinion impede the flow of water of water in the channel. The District further reserves the right to <br />remove portions of the Trail from time to time as the Director determines necessary or convenient to <br />accommodate channel improvements, and further, to not permit the City to rebuild same. The <br />District makes no representation as to the suitability of the soils or the stability of the channel bank <br />for the City's intended purposes. The City understands that in the event of a failure involving distinct <br />elements of the Trail's construction, the District may not permit the City to replace those elements. <br />All other terms and provisions of the Original Agreement shall remain in full force and effect as <br />originally written. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.