My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2011-3357 regulating discharge of industrial waste into public sewers/approved by TCEQ 1/22/2014
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2010's
>
2011
>
O-2011-3357 regulating discharge of industrial waste into public sewers/approved by TCEQ 1/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:13:30 PM
Creation date
7/8/2011 2:33:11 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Any violation of the terms and conditions of a wastewater discharge permit <br />shall be deemed a violation of this article and subjects the wastewater <br />discharge permittee to the sanctions set out in Division 10 through 12 of this <br />article. Obtaining a wastewater discharge permit does not relieve a <br />permittee of its obligation to comply with all Federal and State Pretreatment <br />Standards or requirements or any other requirements of Federal and State <br />and local law. <br />74-73.(" Wastewater Discharge Permitting Existing Connections <br />Any industrial user iNhie-" d-ffi--;r---haFges iRdUStFi l waste required to obtain a <br />wastewater permit who was discharging wastewater into the POTW prior to the <br />effective date of this Wdinaee article and who wishes to continue such <br />discharges in -the future, shall, within ninety ( 90 ) days after said date, apply to <br />the City for a wastewater discharge permit in accordance with S^�,-X74-75 <br />below, and shall not cause and allow discharges to the POTW to continue after <br />ninety ( 90 ) days of the effective date of this ^me article except in <br />accordance with a wastewater discharge permit issued by the Director. <br />74-74 Wastewater Discharge Permitting: New Connections <br />Any User required to obtain a wastewater permit who proposes to begin or <br />recommence discharging into the POTW must obtain such permit prior to the <br />beginning or recommencing of such discharge. An application for this <br />wastewater permit, in accordance with Section 74-75 of this article, must be filed <br />at least thirty (30) calendar days prior to the date upon which any discharge will <br />begin or recommence. <br />74-75, 4:44 Wastewater Discharge Permitting Extrajurisdictional Industrial Users <br />A. Any existing industrial user located beyond the City limits shall submit a <br />wastewater discharge permit application, in accordance with Section 4.6 <br />below, within ninety ( 90 ) a f the e4ective date f thiseFdffinanee. New <br />;RdUStFial users located beywid the Gity limits shall submit sueh applications te <br />The Wastewater discharge application shall be submitted to the CA thirty (30) <br />calendar days prior to date of permit expiration or proposed date of discharge <br />or for new IUs at least thirty (30) calendar days from the date they receive a <br />permit application from the City. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.