Laserfiche WebLink
a. The sample shall be representative of daily operations and shall <br />be analyzed in accordance with procedures set out in Section 74- <br />110 of this article. Where the Standard requires compliance with a <br />BMP or pollution prevention alternative, the IU shall submit <br />documentation as required by the Director or applicable <br />Standards to determine compliance with the Standard. <br />b. Sampling must be performed in accordance with procedures set <br />out in Section 74-111 of this article. <br />c. In cases where the Standard requires compliance with a Best <br />Management Practice or pollution prevention alternative, the IU <br />shall submit documentation as required by the Control Authority <br />of the applicable Standards to determine compliance with the <br />Standard. <br />74-77 (4-.6) Application Signatories and Certification <br />A. All wastewater discharge permit applications, IU reports and certification <br />statements industrial user reports must ntain the following Gertifeeati„n <br />stat,,mem and be signed by an authorized representative of the use IU and <br />contain the certification statement in See ien 6 , ^ ^ 74-114 of this article. <br />"I certify uRdeF penalty of law that this dem m Rt�'�" attachmeRts <br />weweFe r.. aged ender m • diFeetien �r r .IOR i .,rda with system <br />Fe �. �Mm v zn rvc <br />inferisatien submitted. Based en my- in k -the peFSOR OF pe SO„S WhO <br />manage the system, OF these-perse►ns d-Orzr-Aly--resPGRSible f F gatheFi g the <br />iRf$rmatien;-the iRferreati9R submits isle the best-ef-FRY IEnewledge and <br />belief, true , assUrate, and- complete l arra aware that theFe aFe SigRifieaRt <br />penalties f8F SU13FRittiRg false i.,f..rFnBt' OROUdiRg the possibility of -An -e and <br />Ic,« .,f sep,ic-es fee- Lmewi..n vielatie ,, Move to 74-114 <br />B. If the designation of an Authorized Representative is no longer accurate <br />because a different individual or position has responsibility for the overall <br />operation of the facility or overall responsibility of environmental matters for <br />the company, a new written authorization satisfying the requirements of the <br />Section must be submitted to the Director prior to or together with any <br />reports to be signed a Authorized Representative. <br />74-78. {-4,S} Wastewater Discharge Permit t -Decisions <br />The Director will evaluate the data furnished by the industrial user and may <br />require additional information. Within ten ( 10 ) business days of receipt of a <br />24 <br />