My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2011-3357 regulating discharge of industrial waste into public sewers/approved by TCEQ 1/22/2014
LaPorte
>
.Ordinances
>
2010's
>
2011
>
O-2011-3357 regulating discharge of industrial waste into public sewers/approved by TCEQ 1/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:13:30 PM
Creation date
7/8/2011 2:33:11 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Effluent limits applieab:e-te the ORa tF ' specified in 40 GFR <br />mvvicr�airu�ei—v'a` cciricv-rrr-�zr � c <br />403.8 (f)(:)i;::► (C). including Best Management Practices, based on <br />Pretreatment Standards; <br />4. Self-monitoring, sampling, reporting, notification, and record keeping <br />requirements. These requirements shall include an identification of <br />pollutants or BMPs to be monitored, sampling locations, sampling <br />frequency, and sample type. m -rd -,n,.^ w4h nn GFR 403.8 Ifll:l(iii) (n) <br />5. Statement of applicable civil, criminal, and administrative penalties for <br />violation of pretreatment standards and requirement, and any applicable <br />compliance schedule. Such schedule may not extend the time for <br />compliance beyond that required by applicable Federal, State , or Local <br />law. <br />6. Requirements to control Slug Discharge, if determined by the Director to <br />be necessary. <br />B. Wastewater Discharge permits may contain, but not limited to , the <br />following: <br />1. Limits on the average and / or maximum rate of discharge, time of <br />discharge, and/ or requirements for flow regulation and equalization. <br />2. Limits en- the <br />doily, and maRthly--average andjOF <br />Fn aximum eeneeAtFat+e, , Fnass, <br />stewateF pollutants OF PFOpeFties. <br />er ether FneaSUFe of identified <br />2. Requirements for the installation of pretreatment technology, pollution <br />control, or construction of appropriate containment devices, designed to <br />reduce, eliminate, or prevent the introduction of pollutants into the <br />treatment works. <br />3. Requirements for the Development and implementation of spill control <br />plans or other special conditions including management practices <br />necessary to adequately prevent accidental , unanticipated , or routine <br />discharges. <br />4. Development and implementation of waste minimization plans to reduce <br />the amount of pollutants discharged to the POTW. <br />5. The unit charge or schedule of industrial user charges and fees for the <br />management of the wastewater discharge to the POTW. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.