My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2011-3361 amend Water Conservation and Drought Contingency Plan/tabled-bring back 7/11/11
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2010's
>
2011
>
O-2011-3361 amend Water Conservation and Drought Contingency Plan/tabled-bring back 7/11/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:31 PM
Creation date
7/11/2011 8:57:18 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/27/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mark up Drought Contingency Plan- La Porte June 2011 Updatedoc (2) e • • ` •• : - • : • . <br /> { Formatted: Highlight <br /> c. Severe Condition Goal - To achieve a 25 percent reduction in daily water use. <br /> d. Critical Condition Goal - To achieve a 30 percent reduction in daily water use. <br /> E. INFORMATION/EDUCATION <br /> As a component of the Information/Education section in the Water Conservation Plan, the <br /> purpose and effect of the Drought Contingency Plan will be communicated to the public <br /> through articles p noti ` in the • w 9 r : City_ ofT a Porte Formatted: Highlight <br /> websit S }, and other ** .-media outlets such as email. text, social media public access { Formatted: Highlight <br /> tel + Y oa a, !.+ + . sr °- a e ® y e L $ b 3i 1 ° e {Formatted: Highlight <br /> Throughout the period of a trigger condition, regular prtieles -up will appear jr} the { Formatted: Highlight <br /> various media outlets to explain and educate the public on the purpose, cause, and methods of Formatted: Highlight <br /> conservation for that condition. <br /> F. IMPLEMENTATION/ENFORCMENT <br /> The plan shall be implemented by Ordinance of the City Council of the city of La Porte. <br /> Included in the adoption instrument will be individual trigger conditions for the city. A copy <br /> of the adoption vehicle is found in Appendix B. <br /> It will be the responsibility of the City of La Porte Public Works Director to monitor, through <br /> the utility department, the status of the water supply and distribution system. When a trigger <br /> condition is reached, the Public Works Director will notify the public through its information <br /> program, of the implementation of the Drought Contingency Plan. <br /> The Public Works Director will continue to monitor the water emergency until it is <br /> determined that the trigger condition no longer exists. When this takes place, the Public <br /> Works Director will notify the public of such, and the Drought Condition Abatement <br /> procedures will be implemented. <br /> G. UPDATE OF TRIGGER CONDITIONS <br /> Once a year, the City will examine the production requirements and ability to maintain these <br /> requirements to determine if trigger conditions need to be reestablished. Consideration <br /> should be given to the city's usage in relation to the aggregate usage, and any anticipated <br /> increase in production at the Southeast Water Purification Plant. <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.