Laserfiche WebLink
or otherwise not in conformity with the provisions of this article until such wiring, apparatus, device, <br /> appliance, fixture and equipment and their installation have been made safe as directed by him/her in <br /> conformity with this article. <br /> Sec. 82-308. - Installations to be concealed. <br /> When any part of a wiring installation is to be concealed by permanent placement of parts of a <br /> building, the master electrician or authorized representative to whom the permit has been issued shall <br /> notify the inspector, provided that on such installation as the concealment or parts of the wiring must, in <br /> the discretion of the inspector, necessarily proceed continuously, the master electrician to whom the <br /> permit has been issued shall give the inspector due notice, and inspection made periodically during the <br /> progress of work. Where, in the discretion of the inspector, it is necessary, he shall post notice upon the <br /> premises stating that work has been approved and may be covered, or it is not approved and may not be <br /> covered until such further inspection as is necessary has been made. Any person destroying, altering or <br /> defacing such notice without the consent of the inspector, shall be deemed guilty of an offense under this <br /> section, and any work described in the notice shall be stayed pending the further necessary inspection. <br /> Upon the completion of the work that has been authorized by the issuance of a permit, it shall be the duty <br /> of the master electrician to whom the permit has been issued to immediately notify the inspector, who <br /> shall inspect such installations within three days, exclusive of weekends and holidays, of the time such <br /> notice was given. <br /> Sec. 82-309. -Authorization for electrical service. <br /> If the work is found to be in compliance with the provisions of this article, the inspector, subject to the <br /> other applicable provisions of this article, shall issue a final approval to the public utility corporation <br /> furnishing the electrical service or the person supplying the energy, which approval shall authorize <br /> connection of such approved work to the source of energy of the electrical service, the turning on of <br /> current and the use of the installation. No connection shall be made until such authorization and final <br /> approval is given. <br /> Sec. 82-310. - Reinspection; correction of unsafe conditions. <br /> The inspector shall make, upon information or belief that faulty conditions exist, a thorough <br /> reinspection of any electrical wiring, apparatus, devices, appliances, fixtures and equipment now installed <br /> or that may hereafter be installed and within the scope of this article, and when the installation of such <br /> wiring, apparatus, devices, appliances, fixtures and equipment is found to be at variance with the original <br /> permit issued, or to be in a dangerous or unsafe condition, or if it is found that the electrical measuring <br /> device has been tampered with so as to create a condition dangerous to the continuity of the electrical <br /> service or to property, the person owning, using or operating the same shall be notified in writing and <br /> shall make the necessary repairs or changes required to place such wiring, apparatus, devices and <br /> equipment in safe condition so as to relieve the hazards created by such unauthorized conditions, and <br /> shall have such work completed within ten days, or any reasonably longer period specified by the <br /> inspector in the written notice. <br /> Sec. 82-311. -Schedule of fees for inspection. <br /> The master electrician making or supervising installation or alteration of electric wiring, apparatus, <br /> devices, appliances, fixtures or equipment, shall pay to the city fees in such amounts as established by <br /> the city and listed in appendix A of this Code. <br /> Sec. 82-312. - Reserved. <br /> Secs. 82-313-82-335. - Reserved. <br /> DIVISION 5. -STANDARDS <br /> Sec. 82-336. - National Electrical Code—Adoption. <br />