My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2021-3831 amending Chapter 94 "Floods" of the CoLP Code of Ordinances and Chapter 5 of the PICM
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2020's
>
2021
>
O-2021-3831 amending Chapter 94 "Floods" of the CoLP Code of Ordinances and Chapter 5 of the PICM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:53:42 PM
Creation date
6/15/2021 3:51:41 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Legislative No.
O-2021-3831
Date
5/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
alteration or relocation of a watercourse, and submit evidence of such notification <br /> to the Federal Emergency Management Agency. <br /> (7) Assure that the flood carrying capacity within the altered or relocated portion of <br /> any watercourse is maintained. <br /> (8) When base flood elevation data has not been provided in accordance <br /> with section 94-38, the floodplain administrator shall obtain, review and reasonably <br /> utilize any base flood elevation data and floodway data available from a federal, <br /> state or other source, in order to administer the provisions of division 3. <br /> (9) When a regulatory floodway has not been designated, the floodplain <br /> administrator must require that no new construction, substantial improvements, or <br /> other development (including fill) shall be permitted within zones A1-30 and AE on <br /> the community's FIRM, unless it is demonstrated that the cumulative effect of the <br /> proposed development, when combined with all other existing and anticipated <br /> development, will not increase the water surface elevation of the base flood more <br /> than one foot at any point within the community. <br /> (10) Under the provisions of 44 CFR Chapter 1, Section 65.12, of the National <br /> Flood Insurance Program regulations, a community may approve certain <br /> development in zones A1-30, AE, AH, on the community's FIRM which increases <br /> the water surface elevation of the base flood by more than one foot, provided that <br /> the community first completes all of the provisions required by Section 65.12. <br /> Sec. 94-63. - Establishment of development permit. <br /> A floodplain development permit shall be required to ensure conformance with the <br /> provisions of this article. <br /> Sec. 94-64. - Permit procedures. <br /> (1) Application for a floodplain development permit shall be presented to the floodplain <br /> administrator on forms furnished by him/her and may include, but not be limited to, plans in <br /> duplicate drawn to scale showing the location, dimensions, and elevation of proposed <br /> landscape alterations, existing and proposed structures, including the placement of <br /> manufactured homes, and the location of the foregoing in relation to areas of special flood <br /> hazard or moderate flood hazard. Additionally, the following information is required: <br /> (a) Elevation (in relation to mean sea level), of the lowest floor (including basement) of all <br /> new and substantially improved structures; <br /> (b) Elevation in relation to mean sea level to which any nonresidential structure shall be <br /> floodproofed; <br /> (c) A certificate from a registered professional engineer or architect that the nonresidential <br /> floodproofed structure shall meet the floodproofing criteria of section 94-87(2); <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.