My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2021-3831 amending Chapter 94 "Floods" of the CoLP Code of Ordinances and Chapter 5 of the PICM
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2020's
>
2021
>
O-2021-3831 amending Chapter 94 "Floods" of the CoLP Code of Ordinances and Chapter 5 of the PICM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:53:42 PM
Creation date
6/15/2021 3:51:41 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Legislative No.
O-2021-3831
Date
5/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
connected to the required utilities. The term "manufactured home" does not include a "recreational <br /> vehicle". <br /> Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided <br /> into two or more manufactured home lots for rent or sale. <br /> Mean sea level means, for purposes of the National Flood Insurance Program, the National <br /> Geodetic Vertical Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on <br /> a community's flood insurance rate map are referenced. <br /> Moderate flood hazard area. See "area of moderate flood hazard." <br /> New construction means, for the purpose of determining insurance rates, structures for which the <br /> "start of construction" commenced on or after the effective date of an initial FIRM or after <br /> December 31, 1974, whichever is later, and includes any subsequent improvements to such <br /> structures. For floodplain management purposes, "new construction" means structures for which <br /> the "start of construction" commenced on or after the effective date of a floodplain management <br /> regulation adopted by a community and includes any subsequent improvements to such <br /> structures. <br /> New manufactured home park or subdivision means a manufactured home park or subdivision for <br /> which the construction of facilities for servicing the lots on which the manufactured homes are to <br /> be affixed (including at a minimum, the installation of utilities, the construction of streets, and <br /> either final site grading or the pouring of concrete pads) is completed on or after the effective date <br /> of floodplain management regulations adopted by a community. <br /> Primary frontal dune means a continuous or nearly continuous mound or ridge of sand with <br /> relatively steep seaward and landward slopes immediately landward and adjacent to the beach <br /> and subject to erosion and overtopping from high tides and waves during major coastal storms. <br /> The inland limit of the primary frontal dune occurs at the point where there is a distinct change <br /> from a relatively steep slope to a relatively mild slope. <br /> Recreational vehicle means a vehicle which is (i) built on a single chassis; (ii) 400 square feet or <br /> less when measured at the largest horizontal projections; (iii) designed to be self-propelled or <br /> permanently towable by a light duty truck; and (iv) designed primarily not for use as a permanent <br /> dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. <br /> Regulatory floodway means the channel of a river or other watercourse and the adjacent land <br /> areas that must be reserved in order to discharge the base flood without cumulatively increasing <br /> the water surface elevation more than a designated height. <br /> Riverine means relating to, formed by, or resembling a river (including tributaries), stream, brook, <br /> etc. <br /> Sand dunes mean naturally occurring accumulations of sand in ridges or mounds landward of the <br /> beach. <br /> Special flood hazard area."See "area of special flood hazard." <br /> Start of construction (For other than new construction or substantial improvements under the <br /> Coastal Barrier Resources Act (Pub. L. 97-348)), includes substantial improvement and means the <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.