My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2022-3868 Approving an Amendment to the Budget for FY 2021-2022
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2020's
>
2022
>
O-2022-3868 Approving an Amendment to the Budget for FY 2021-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 10:56:35 AM
Creation date
2/21/2022 9:12:35 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: February 14, 2022 <br />Requested By: Ray Mayo, Director <br />Department: Public Works <br />C: Report C Resolution (- Ordinance <br />Exhibits: Consultant Proposal for Utility Relocations, <br />Project estimate, Conflict Listing <br />Appropriation <br />Source of Funds: <br />Account Number: <br />Amount Budgeted: $ 0 <br />Amount Requested: $99,095.00 <br />Budgeted Item: �- Yes Ce No <br />SUMMARY & RECOMMENDATION <br />Texas Department of Transportation (TxDOT) intends to provide drainage <br />improvements in conjunction with the widening of State Highway 146 from Spencer <br />Highway to Red Bluff. Multiple water and sewer lines cross the Highway 146 corridor in <br />this section. Four (4) of these have been determined to have a conflict with the <br />proposed drainage improvements. Two (2) of these conflicts will require the pipes to be <br />relocated at deeper depths to avoid the conflict. The two (2) remaining conflicts are able <br />to remain in place, but will require a concrete encasement to protect the utility. <br />Cobb Fendley, has been involved in many phases of the TxDOT 146 widening and has <br />provided a proposal for design and coordination of utility agreements to meet TxDOT <br />requirements. This scope of this work was not available during the budget planning <br />process. Funds can be appropriated by a budget amendment. To minimize cost, <br />disruption to traffic flow, and delays to the widening project, construction work to <br />address the utility conflicts will be conducted in conjunction with the widening project. <br />A TxDOT contractor will perform the work and the City will have input and oversight of <br />the work specific to the utility lines. An agreement will be negotiated for the actual <br />construction costs and funds will be programmed for the FY 22-23 budget. Construction <br />costs are currently estimated at $782,520.00 <br />Staff recommends approval of a budget amendment and acceptance of the proposal <br />from Cobb Fendley to provide these professional engineering services for the City of <br />La Porte. <br />Benefits: <br />Design efforts can be accomplished in a suitable timeframe. <br />Construction efforts can be combined into the highway improvement project. <br />Liabilities: <br />0 Conflict information was not available during budget planning process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.