Laserfiche WebLink
<br />Schedule 4 <br /> <br />HOU03:827974.4 <br /> <br />e <br /> <br />e <br /> <br />69kV Disconnect Switch P702 for Standby Transformer A located on <br />Easement Parcel PS08-G 103 (such parcel being more definitely described <br />on Schedule 3B attached hereto) <br /> <br />138kV Breaker for Standby Transformer B located on Easement Parcel <br />PS08-G 106 (such parcel being more definitely described 9n Schedule 3C <br />attached hereto) <br /> <br />138kV Disconnect Switch for Standby Transformer B located on <br />Easement Parcel PS08-GI06 (such parcel being more definitely described <br />on Schedule 3C attached hereto) <br /> <br />138kV transmission lines for Standby Transformer B partially within <br />Easement Parcels PS08-012 (such parcel being more definitely described <br />on Schedule 3D attached hereto) and PS08-015 (such parcel being more <br />definitely described on Schedule 3E attached hereto) <br /> <br />Portion of Grantor's Severed Property (electrical lines, towers and <br />foundations) within Plant Land: <br /> <br />Tangent tower and foundations supporting the overhead lines from Main <br />Transformer #3 and the 138kV substation located on Easement Parcel <br />P<::08-014 (such Easement Parcel being more definitely described on <br />Schedule 4A attached hereto) <br /> <br />Overhead 138kV electrical lines connecting Main Transformer #4 to the <br />substation located on Easement Par(~el PS08-0 12 (such Easement Parcel <br />being previously described on Schedule 3D attached hereto) <br /> <br />Overhead 138kV electrical lines connecting Main Transformer #3 to the <br />substation located on Easement Parc=el PS08-015 (such Easement Parcel <br />being previously described on Schedule 3E attached hereto) <br /> <br />2 <br />