My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-IDA-66
LaPorte
>
Legislative records
>
Ordinances - GR1000-05
>
2000's
>
2000
>
2000-IDA-66
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2007 3:47:08 PM
Creation date
12/28/2022 10:15:46 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Ordinances
Date
8/26/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />.'", <br /> <br />3 <br /> <br />for industrial processes. <br /> <br /># <br /> <br />(F) The average monthly d~rpand of ONF. HI~RFO TWRNTV-N1NR ntntJs~~ SIX <br /> <br />HIJNt?RFO TWHNTV-F1VF. (129fl'~) gallons i~ established by multiplying the av~~e daily <br />.. . i ," <br />deInai1d by a factor of 30.5, which shall be used to facilitate service billirigs, <br /> <br />. .' <br /> <br />(G)the ~st of water up to the average monttiIy dtiihand ~f ONF. HIJNnRFO TWP.NTv-~ <br />'. . ' ' " r" ' <br /> <br />'''riftjh~A"Nri SIX tthNORFO TWHNTV-F~. (129,6'~) gallo~ shall be orl~ hundred f1fty <br />." .pJclmt (1500.10) of the CfnnS rate as establisl1ed from time to time for commercial custdm~ <br />inside its corporate limits. <br /> <br />(H) The cost of water for amounts used in excess of the established average monthly demand shall be <br />two hundred percent (200%) of the CITY'S rate as established from time to time for commercial <br />customers inside its corporate limits, <br /> <br />Q) . ~othing contained in this Agreement shall obligate CITY to furnish more than the average monthly <br />demand ofONF. HIJNnRFO TWRNTV-NTNF. THOlTSANn SIXHIJNnRFO TWRNTV-FJVF4: <br />(1 '9,6'~), Repeated consumption greater than the established average monthly demand may result . <br />in termination of service. <br /> <br />(J) CITY shall have the right to interrupt or temporarily suspend said water service to COMPANY if <br />an emergency arises and there is not an adequate water supply to meet the needs of the citizens of <br />La Porte. <br /> <br />(K) CITY reserves the right to enforce its drought contingency plan on all water customers at CITY'S <br />sole discretion. <br /> <br />(L) The total cost for the engineet,ing design and construction of any potable water main, service line, <br />back flow preventer, meter or other required appurtenances will be the responsibility of <br />COMPANY. <br />
The URL can be used to link to this page
Your browser does not support the video tag.