My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-IDA-69
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2000
>
2000-IDA-69
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2007 3:46:53 PM
Creation date
12/28/2022 10:15:49 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Ordinances
Date
1/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.......~ <br />. . <br /> <br />e <br /> <br />e <br /> <br />2 <br /> <br />1 <br />7'.. . <br /> <br />4. Owner agrees to pay all costs related to the const11lction and installation of said utility main(s) <br /> <br />including necessary appurtenances in confonnance with City's standards and specifications for said <br /> <br />utility main(s). Owner further agrees to pay all engineering fees for survey, design, contract <br />documents, bidding, construction staking, const11lction inspection, and preparation and submittal of <br /> <br />As-Built const11lction dmwings, <br /> <br />5. Subject to the provisions of this agreement, City hereby agrees to the const11lction and installation of <br /> <br />said utility main(s) according to the plans, specifications and contract documents to be prepared by the <br /> <br />Owner's engineer and approved by the City. The contract documents shall include a provision for a <br />one (1) year warranty from defects in materials and workmanship. The documents will also provide a <br />"Notice" to Contractor that the City of La Porte will perform daily const11lction inspection to insure <br /> <br />compliance with plans and specifications. Owner agrees that City will not be responsible for issuing or <br /> <br />approving payments to the Contractor. It is agreed and understood that Owner is responsible for <br /> <br />paying for any unforeseen costs or cost overruns in the project that result from circumstances beyond <br /> <br />the control of the City, <br /> <br />6. City shall have the right to approve the Engineer and the Contractor selected by Owner. Upon <br /> <br />completion and approval of plans, specifications, and contract documents, the City shall authorize the <br /> <br />Owner to secure bids from qualified underground utility contractors. <br /> <br />7. Owner agrees that upon completion and acceptance by City, City will assume ownership and <br /> <br />maintenance of the utility main(s) and as such shall have full control over future extensions and <br /> <br />connections thereto. <br />
The URL can be used to link to this page
Your browser does not support the video tag.