Laserfiche WebLink
<br />3 <br /> <br />industrial processes. <br /> <br />(F) The average monthly demand of THREE HUNDRED FOURTEEN THOUSAND ONE <br />HUNDRED FIFTY (314.150) gallons is established by multiplying the average daily demand by a <br />factor of30.5, which shall be used to facilitate service billings. <br /> <br />(G)The cost of water up to the average monthly demand of THREE HUNDRED FOURTEEN <br />THOUSAND ONE HUNDRED FIFTY (314.150) gallons shall be one hundred fifty percent <br />(150%) of the CITY'S rate as established from time to time for commercial customers inside its <br />corporate limits. <br /> <br />(H) The cost of water for amounts used in excess of the established average monthly demand shall be <br />two hundred percent (200%) of the CITY'S rate as established from time to time for connnercial <br />customers inside its corporate limits. <br /> <br />(1) Nothing contained in this Agreement shall obligate CITY to finnish more than the average monthly <br />demand of THREE HUNDRED FOURTEEN THOUSAND ONE HUNDRED FIFTY <br />(314.150). Repeated consumption greater than the established average monthly demand may resuh <br />in termination of service. <br /> <br />(1) CITY shall have the right to interrupt or temporarily suspend said water service to COMPANY if <br />an emergency arises and there is not an adequate water supply to meet the needs of the citizens of <br />La Porte. <br /> <br />(K) CITY reserves the right to enforce its drought contingency plan on all water customers at CITY'S <br />sole discretion. <br /> <br />(L) The total cost for the engineering design and construction of any potable water main, service line, <br />back flow preventer, meter or other required appmtenances will be the responsibility of <br />COMPANY. <br />