Laserfiche WebLink
THENCE: Continuing along said northwest Iine, South 66 deg 15 min 53 sec West, a <br />distance of 461.09 feet to a set 518-inch iron rad with cap, the most westerly southwest <br />corner of the herein described tract; <br />THENCE: Departing said northwest Line, North 29 deg 17 min 22 sec West, a distance of <br />260.34 feet to a set 5/8-inch iron rod with cap, an angle point; <br />THENCE: Paralled to and 77.00 feet east of the common Iine of the east Iine of the <br />Exxon Pipeline Company Easement and the west Iine of said 237.103-acre tract, North 02 <br />deg 28 min 20 sec West, a distance of 629.69 feet to a set 518-inch iron rod with cap, <br />being the point of curvature of a curve to the right, the most westerly northwest corner of <br />the herein described tract; <br />THENCE: Arotu~.d said curve to the right, an arc length of 303.73 feet, with a radius of <br />4I6.S9 feet, a central angle of 41 deg 46 min 27 sec, having a chord distance of 297.05 <br />feet bearizzg North 18 deg 24 min S3 sec East to a set 5/8-inch iron rod with cap, being <br />the point of curvature of a curve to the right, an angle point; <br />THENCE:.- around said curve to the right; an: arc' length of 283.02 feet, with a radius. af. ; ~ -. <br />411.89 feet, a central angle of 39 deg 22 min 06 sec, having a chord distance of 277:48 <br />feet be~-ing North 58 deg 59 min l0 sec~East.to a set 518-inch iron rod with cap; .being ~~ <br />the point~of'tangency, an angle point;° ~ - <br />THENCE: North 78 deg 40 min-14. sec.East;.a°distance. of 33.39 feet to the PO1N~'' OE- <br />SEGIIVI~TING and contair~iazg $7.908. acres-ar.3.,829,245 square feet of land, more or'le5s. `~ ~ ~ . <br /> <br />