Laserfiche WebLink
~._.. <br />t <br />S t <br />THENCE: Continuing along said northwest line, South 66 deg 15 min 53 sec West, a <br />distance of 461.09 feet to a set 518-inch iron rod with cap, the most westerly southwest <br />corner of the herein described tract; <br />THENCE: Departing said northwest line, North 29 deg 17 min 22 sec West, a distance of <br />260.30 feet to a set 5/8-inch iron rod with cap, an angle point; <br />THENCE: Parallel to and 77.00 feet east of the common line of the east line of the <br />Exxon Pipeline Company Easement and the west line of said 237.103-acre tract, North 42 <br />deg 28 min 20 sec West, a distance of 629.69 feet to a set 518-inch iron rod with cap, <br />being the point of curvature of a curve to the right, the most westerly northwest corner of <br />the herein. described tract; <br />THENCE: Around said curve to the right, an arc length of 303.73 feet, with a radius of <br />4I6.59 feet, a central angle of 41 deg 46 min 27 sec, having a chord distance of 297.45 <br />feet bearing North 18 deg 24 min 53 sec East to a set 518-inch iron rad with cap, being <br />the point of curvat~zre of a curve to the right, an angle point; <br />THENCE:: Around said curve to the right; an arc .length of 2$3.02 feet, with a radius. of~. ' ~ ~- <br />411.89 feet, a central angle of 39 deg 22 min 06 sec, having a chord distance of 277.48 <br />feed bearing: North 58 deg 59 min 10' sec East. to a set 518-inch iron rod with caps .b~~g: ,' <br />the point ~of'tangency, an angle paint;:. ~ . <br />THENCE, North 78 deg 40 min 14. sec.East;~.a:distance. of 353.39 feet to the POINT' OE~ <br />BEGINI~INC'r and containing 87.908. acres or• .3.,829,2.48 square- feet of land, more or~ less. `~ <br /> <br />