Laserfiche WebLink
L <br />point being the southeast comer of the herein described tract of land; <br />THENCE South 70 deg. 53 min. 46 sec. West, departing the westerly right-of-way line of Bay Area <br />Boulevard, along and with the said northerly line of the 40 feet wide pipeline easement, a distance of <br />1,238.62 feet to a 5/8 inch iron rod with cap found at an angle point, same point being the northwesterly <br />corner of the 40 feet wide pipeline easement and the northeasterly corner of a 50 feet wide pipeline <br />easement granted to Tennessee Gas Transmission Company, by deed recorded under Clerk's File No. <br />C533723 of the H.C.O.P.R-F.P.; <br />THENCE South 65 deg. 54 min. 12 sec. West, along and with the northerly line of the said 50 feet wide <br />pipeline easement, a distance of 149.08 feet to a 5/8 inch iron rod with cap found at the southwest corner <br />of the herein described tract of land; <br />THENCE North 02 deg. 34 min. 07 sec. West, departing the northerly line of the 50 feet wide pipeline <br />easement, a distance of 563.39 feet to a 5/8 inch iron rod with cap found at the point of curvature of a non - <br />tangent curve to the right; <br />THENCE in a northeasterly direction, along and with said non -tangent curve to the right subtending a <br />central angle of 49 deg. 40 min. 57 sec., a radius of 80.00 feet, an arc length of 69.37 feet, a chord bearing <br />of North 62 deg. 35 min. 30 sec. East and a chord distance of 67.22 feet to a 5/8 inch iron rod with cap <br />found at the point of terminus of said curve; <br />THENCE North 87 deg. 25 min. 58 sec. East, a distance of 1,270.10 feet to the POINT OF BEGINNING, <br />containing within these metes and bounds.11.626 acres (506,415 square feet) of land. <br />