My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord 2024-4024_Adopting Drought Contingency Plan
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2020's
>
2024
>
Ord 2024-4024_Adopting Drought Contingency Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 4:42:47 PM
Creation date
10/15/2024 7:49:58 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Legislative No.
2024-4024
Date
10/14/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water demand approaching 7,618,000 gallons/day (80% of the pumping capacity owned <br />by the Authority at the Southeast Water Purification Plant plus allowed groundwater <br />withdrawal). <br />Or, <br />b. Production at the Southeast Water Purification Plant reduced to a point that the <br />aggregate demand of the Authority is 80%of the reduced pumping capacity. <br />c. Stage 2 may be rescinded when the trigger conditions have ceased to exist. Upon <br />termination of Stage 2, Stage 1 becomes operative. Rescinding any level of the Plan is at <br />the discretion of the City Manager. <br />3. Severe Conditions (Stage 3) <br />Water demand approaching 8,570,000 gallons/day (90% of the pumping capacity <br />owned by the Authority at the Southeast Water Purification Plant plus allowed <br />groundwater withdrawal). <br />Or, <br />b. Production at the Southeast Water Purification Plant reduced to a point such that the <br />aggregate surface water demand of the Authority is 90% of the reduced pumping <br />capacity. <br />c. Stage 3 may be rescinded when the trigger conditions have ceased to exist. Upon <br />termination of Stage 3, Stage 2 becomes operative. Rescinding any level of the Plan is <br />at the discretion of the City Manager. <br />4. Critical Conditions (Stage 4) <br />a. Surface water demand exceeds 8,656,000 gallons/day. <br />Or, <br />b. Production at the Southeast Water Purification Plant reduced to a point such that the <br />aggregate surface water demand of the Authority exceeds the reduced production, <br />including complete failure of the plant to produce any water. <br />Or, <br />c. Disaster or damage causing system failure in the City of La Porte water system that <br />significantly curtails available water supply. <br />d. Stage 4 may be rescinded when the trigger conditions have ceased to exist. Upon <br />termination of Stage 4, Stage 3 becomes operative. Rescinding any level of the Plan is at <br />the discretion of the City Manager. <br />F. DROUGHT STAGES AND NOTIFICATION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.