Laserfiche WebLink
Some ground disturbance should be expected as a result of our fieldwork. <br /> Ninyo & Moore will contact Texas811 prior to performing our subsurface evaluation. We will not <br />be responsible for damage to utilities encountered during subsurface exploration that have not <br />been marked out or shown on plans. <br /> Ninyo & Moore will not need to obtain any permits or environmental clearance as a part of this <br />project. <br /> Our field exploration does not include any sampling, testing, or chemical analysis of soil, <br />groundwater, surface water, or other materials for the purpose of evaluating possible <br />environmental hazards or risks. These services can be provided, if requested, as an additional <br />scope of work. <br />SCHEDULE <br />We are prepared to initiate this project immediately upon receiving your authorization to proceed. <br />Assuming that there are no delays due to inclement weather or site access restrictions, we <br />anticipate that our fieldwork will be performed within about two weeks after receipt of the notice to <br />proceed. We anticipate issuing a report within about six weeks after fieldwork is completed. <br />FEE <br />We propose to provide our services on a time-and-materials basis for an estimated fee of <br />$45,599 (Forty-Five Thousand Five Hundred Ninety-Nine Dollars) as shown on the attached cost <br />estimate. The above estimated fee assumes up to three days to clear pathways to the boring <br />locations depending on which site is selected. Any additional services, not included in the <br />aforementioned scope, will be charged on a time-and-materials basis in accordance with our <br />current fee schedule. <br />To authorize our services, please sign and return the attached Work Authorization and Agreement. <br />We look forward to working with you. <br />Respectfully submitted, <br />NINYO & MOORE <br />Jeff Rodgers, PE, PG Jay Sunderwala, PE <br />Principal Engineer Managing Principal Engineer <br />JSR/JTS/ls <br />Attachments: Cost Estimate <br />Work Authorization and Agreement <br />3 <br />Ninyo & Moore | Willow Springs Bayou (B112-00-00) 100 ac-ft Detention Pond ILA Project, La Porte, Texas | 16-01103 | August 17, 2021 <br /> <br />