My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-12 and 08-13-13 Regular Meeting, including Budget Workshop of La Porte City Council
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2013
>
08-12 and 08-13-13 Regular Meeting, including Budget Workshop of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2013 12:24:01 PM
Creation date
11/21/2024 8:07:01 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
8/12/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />During the June 10, 2013regular City Council meeting, City Council asked that staff move <br />forward with installation of a permanent mounted natural gas fired generator at City Hall and <br />installation of additional switchgear at the Police Department for connection of an emergency <br />portable generator.Additionally Council requested that staff return with an estimate to install a <br />permanent mount natural gas fired generator at the Wastewater Treatment Plant. During the July <br />8,2013 regular City Council meeting Council approved staff moving forward with the <br />installation of a permanent mount gas fired generator at the Wastewater Treatment Plant. <br />Shrader Engineering has provided numerous electrical designs for the City of La Porte and was <br />selected by staff to provide a proposal for the design of permanent generator installations at City <br />Hall and Wastewater Treatment Plant alsoswitchgear at Police Department.The proposal <br />includes site layout, generator specifications, electrical schematics,and construction phase <br />services. Design services do not include decorative screening for the generator at City Hall. <br />Costs for the propose design and construction phase services are as follows: <br />Electrical Design Phase Services $95,100.00 <br />Construction Phase Services $16,000.00 <br />Total $111,100.00 <br />This design and construction services expense was included in generator budget package of <br />$1,100,000 (FY 13) + proposed $1,300,000 (FY 14). Staff recommends awarding design of <br />generator and switchgear installation to Shrader Engineering who has previously provided <br />electrical design to numerous City facilities and generator installations. <br />Consider approval or other action authorizing the City Manager to execute an agreement with <br />Shrader Engineering to design a generator installation at City Hall and the Wastewater Treatment <br />Plant and additional switchgear at the Police Department Facility in the amount of $111,100.00. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.